Started
Jun 3, 2021 08:58:40 AM
Ended
Jun 3, 2021 11:55:31 AM
Features Passed
20
Features Failed
8
Features
Scenarios
Steps
Timeline
Tags
| Name | Passed | Failed | Skipped | Others | Passed % |
|---|---|---|---|---|---|
| @WBSInformationDPS | 5 | 0 | 0 | 0 | 100% |
| @wbsInformation | 7 | 0 | 0 | 0 | 100% |
| @projectInformation | 31 | 0 | 0 | 0 | 100% |
| @WBSInformation | 6 | 0 | 0 | 0 | 100% |
| @ReferenceLibrary | 0 | 8 | 0 | 0 | 0% |
| @TestCase44745 | 2 | 4 | 0 | 0 | 33.333% |
System/Environment
| Name | Value |
|---|---|
| version | 10 |
| os | Windows |
-
Validating New Project Creation as a SuperUser Role
08:58:41 AM / 00:00:33:766 Pass
Validating New Project Creation as a SuperUser Role
06.03.2021 08:58:41 06.03.2021 08:59:15 00:00:33:766 · #test-id=1@projectInformationPassValidate New Project CreationPassValidate New Project CreationGiven validate user login as a "superuser@bv.com" roleUSER HAS LOGGED-IN SUCCESSFULLYThen closing the browser -
Validating AssignTeam Header as a SuperUser Role
08:59:15 AM / 00:17:40:087 Pass
Validating AssignTeam Header as a SuperUser Role
06.03.2021 08:59:15 06.03.2021 09:16:55 00:17:40:087 · #test-id=8PassValidate login as SuperUser rolePassValidate login as SuperUser roleGiven validate user login as a "superuser@bv.com" roleUSER HAS LOGGED-IN SUCCESSFULLYThen validate user select newly created project cardPROJECT HAS BEEN SELECTED SUCCESSFULLYThen validate "Assign Team" header is clickedUSER HAS BEEN CLICKED ON HEADER SUCCESSFULLYPassValidate PipingLead Section: Select Roles and add professional name and NavigationPassValidate PipingLead Section: Select Roles and add professional name and NavigationWhen validate "Piping Leads" section is NOT completed, an empty circle next to the Section label will display in left panelWhen validate toggle is ON and the name field will enableWhen validate entering the assignee name, it will search for matching names and display NameJobFamilyOffice "Piping Discipline / Lead / Kansas"Then Validate user click on the save buttonUSER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLYWhen validate upon making an edit, the Save button will be enabled and the Complete button will be disable "Electrical Discipline / Lead / Kansas"When validate System will prompt user to save record if user is moving away from sectionscreen to "Electrical Leads" without saving dataWhen validate the section information has been saved and the Complete button will be enabledWhen validate toggling off a role with a name populated the name will clear and field will disableThen Validate user click on the save buttonUSER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLYWhen validate a section within a header area that does not have dependencies Project Information, Project Reference Library, Assign Project Lead has been marked complete, the Reset, Save and Complete buttons will be replaced with an Edit buttonWhen validate Section is completed, a check next to the "Piping Leads" label will display in left panelThen Validate user click on the Edit buttonWhen validate clicking on Define User Permissions displays a list of user permissions so that I can assign an individual in Discipline "Piping Discipline / Lead / Kansas"Then validate hovering over i icon next to user permissions provides additional informationORdescription of permissionsThen validate user can select Save to save the selectionsPassValidate Electrical Leads Section: Select Roles and add professional name and NavigationPassValidate Electrical Leads Section: Select Roles and add professional name and NavigationThen validate user click on "Electrical Leads"When validate "Electrical Leads" section is NOT completed, an empty circle next to the Section label will display in left panelWhen validate toggle is ON and the name field will enableWhen validate entering the assignee name, it will search for matching names and display NameJobFamilyOffice "Electrical Discipline / Lead / Kansas"Then Validate user click on the save buttonUSER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLYWhen validate upon making an edit, the Save button will be enabled and the Complete button will be disable "iandc Discipline / Lead / Kansas"When validate System will prompt user to save record if user is moving away from sectionscreen to "Piping Leads" without saving dataWhen validate the section information has been saved and the Complete button will be enabledWhen validate toggling off a role with a name populated the name will clear and field will disableThen Validate user click on the save buttonUSER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLYWhen validate a section within a header area that does not have dependencies Project Information, Project Reference Library, Assign Project Lead has been marked complete, the Reset, Save and Complete buttons will be replaced with an Edit buttonWhen validate Section is completed, a check next to the "Electrical Leads" label will display in left panelThen Validate user click on the Edit buttonWhen validate clicking on Define User Permissions displays a list of user permissions so that I can assign an individual in Discipline "Electrical Discipline / Lead / Kansas"Then validate hovering over i icon next to user permissions provides additional informationORdescription of permissionsThen validate user can select Save to save the selectionsPassValidate I&C Leads Section: Select Roles and add professional name and NavigationPassValidate I&C Leads Section: Select Roles and add professional name and NavigationThen validate user click on "I&C Leads"When validate "I&C Leads" section is NOT completed, an empty circle next to the Section label will display in left panelWhen validate toggle is ON and the name field will enableWhen validate entering the assignee name, it will search for matching names and display NameJobFamilyOffice "iandc Discipline / Lead / Kansas"Then Validate user click on the save buttonUSER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLYWhen validate upon making an edit, the Save button will be enabled and the Complete button will be disable "Structural Discipline / Lead / Kansas"When validate System will prompt user to save record if user is moving away from sectionscreen to "Electrical Leads" without saving dataWhen validate the section information has been saved and the Complete button will be enabledWhen validate toggling off a role with a name populated the name will clear and field will disableThen Validate user click on the save buttonUSER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLYWhen validate a section within a header area that does not have dependencies Project Information, Project Reference Library, Assign Project Lead has been marked complete, the Reset, Save and Complete buttons will be replaced with an Edit buttonWhen validate Section is completed, a check next to the "I&C Leads" label will display in left panelThen Validate user click on the Edit buttonWhen validate clicking on Define User Permissions displays a list of user permissions so that I can assign an individual in Discipline "iandc Discipline / Lead / Kansas"Then validate hovering over i icon next to user permissions provides additional informationORdescription of permissionsThen validate user can select Save to save the selectionsPassValidate Structural Leads Section: Select Roles and add professional name and NavigationPassValidate Structural Leads Section: Select Roles and add professional name and NavigationThen validate user click on "Structural Leads"When validate "Structural Leads" section is NOT completed, an empty circle next to the Section label will display in left panelWhen validate toggle is ON and the name field will enableWhen validate entering the assignee name, it will search for matching names and display NameJobFamilyOffice "Structural Discipline / Lead / Kansas"Then Validate user click on the save buttonUSER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLYWhen validate upon making an edit, the Save button will be enabled and the Complete button will be disable "Process Discipline / Lead / Kansas"When validate System will prompt user to save record if user is moving away from sectionscreen to "I&C Leads" without saving dataWhen validate the section information has been saved and the Complete button will be enabledWhen validate toggling off a role with a name populated the name will clear and field will disableThen Validate user click on the save buttonUSER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLYWhen validate a section within a header area that does not have dependencies Project Information, Project Reference Library, Assign Project Lead has been marked complete, the Reset, Save and Complete buttons will be replaced with an Edit buttonWhen validate Section is completed, a check next to the "Structural Leads" label will display in left panelThen Validate user click on the Edit buttonWhen validate clicking on Define User Permissions displays a list of user permissions so that I can assign an individual in Discipline "Structural Discipline / Lead / Kansas"Then validate hovering over i icon next to user permissions provides additional informationORdescription of permissionsThen validate user can select Save to save the selectionsPassValidate Process Leads Section: Select Roles and add professional name and NavigationPassValidate Process Leads Section: Select Roles and add professional name and NavigationThen validate user click on "Process Leads"When validate "Process Leads" section is NOT completed, an empty circle next to the Section label will display in left panelWhen validate toggle is ON and the name field will enableWhen validate entering the assignee name, it will search for matching names and display NameJobFamilyOffice "Process Discipline / Lead / Kansas"Then Validate user click on the save buttonUSER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLYWhen validate upon making an edit, the Save button will be enabled and the Complete button will be disable "Equipment Discipline / Lead / Kansas"When validate System will prompt user to save record if user is moving away from sectionscreen to "Structural Leads" without saving dataWhen validate the section information has been saved and the Complete button will be enabledWhen validate toggling off a role with a name populated the name will clear and field will disableThen Validate user click on the save buttonUSER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLYWhen validate a section within a header area that does not have dependencies Project Information, Project Reference Library, Assign Project Lead has been marked complete, the Reset, Save and Complete buttons will be replaced with an Edit buttonWhen validate Section is completed, a check next to the "Process Leads" label will display in left panelThen Validate user click on the Edit buttonWhen validate clicking on Define User Permissions displays a list of user permissions so that I can assign an individual in Discipline "Process Discipline / Lead / Kansas"Then validate hovering over i icon next to user permissions provides additional informationORdescription of permissionsThen validate user can select Save to save the selectionsPassValidate Equipment Leads Section: Select Roles and add professional name and NavigationPassValidate Equipment Leads Section: Select Roles and add professional name and NavigationThen validate user click on "Equipment Leads"When validate "Equipment Leads" section is NOT completed, an empty circle next to the Section label will display in left panelWhen validate toggle is ON and the name field will enableWhen validate entering the assignee name, it will search for matching names and display NameJobFamilyOffice "Equipment Discipline / Lead / Kansas"Then Validate user click on the save buttonUSER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLYWhen validate upon making an edit, the Save button will be enabled and the Complete button will be disable "Ramesh Rathod / Project Engineer / Wipro"When validate System will prompt user to save record if user is moving away from sectionscreen to "Process Leads" without saving dataWhen validate the section information has been saved and the Complete button will be enabledWhen validate toggling off a role with a name populated the name will clear and field will disableThen Validate user click on the save buttonUSER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLYWhen validate a section within a header area that does not have dependencies Project Information, Project Reference Library, Assign Project Lead has been marked complete, the Reset, Save and Complete buttons will be replaced with an Edit buttonWhen validate Section is completed, a check next to the "Equipment Leads" label will display in left panelThen Validate user click on the Edit buttonWhen validate clicking on Define User Permissions displays a list of user permissions so that I can assign an individual in Discipline "Equipment Discipline / Lead / Kansas"Then validate hovering over i icon next to user permissions provides additional informationORdescription of permissionsThen validate user can select Save to save the selectionsPassValidate Management Team Section: Select Roles and add professional name and NavigationPassValidate Management Team Section: Select Roles and add professional name and NavigationThen validate user click on "Management Team"When validate "Management Team" section is NOT completed, an empty circle next to the Section label will display in left panelWhen validate toggle is ON and the name field will enableWhen validate entering the assignee name, it will search for matching names and display NameJobFamilyOffice "Ramesh Rathod / Project Engineer / Wipro"Then Validate user click on the save buttonUSER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLYWhen validate upon making an edit, the Save button will be enabled and the Complete button will be disable "Vepur S / Project Engineer / Wipro"When validate System will prompt user to save record if user is moving away from sectionscreen to "Equipment Leads" without saving dataWhen validate the section information has been saved and the Complete button will be enabledWhen validate toggling off a role with a name populated the name will clear and field will disableThen Validate user click on the save buttonUSER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLYWhen validate a section within a header area that does not have dependencies Project Information, Project Reference Library, Assign Project Lead has been marked complete, the Reset, Save and Complete buttons will be replaced with an Edit buttonWhen validate Section is completed, a check next to the "Management Team" label will display in left panelThen Validate user click on the Edit buttonWhen validate clicking on Define User Permissions displays a list of user permissions so that I can assign an individual in Discipline "Ramesh Rathod / Project Engineer / Wipro"Then validate hovering over i icon next to user permissions provides additional informationORdescription of permissionsThen validate user can select Save to save the selections -
Validating Project Information Header as a PLI Role
09:16:55 AM / 02:06:11:112 Pass
Validating Project Information Header as a PLI Role
06.03.2021 09:16:55 06.03.2021 11:23:06 02:06:11:112 · #test-id=155@projectInformationPassValidate login as PLI rolePassValidate login as PLI roleGiven validate user login as a "RathodR@bv.com" roleUSER HAS LOGGED-IN SUCCESSFULLYThen validate user select newly created project cardPROJECT HAS BEEN SELECTED SUCCESSFULLYThen validate "Project Information" header is clickedUSER HAS BEEN CLICKED ON HEADER SUCCESSFULLYPassChecking the Initial fuctionality GeneralProjectInformation SubSectionWhen User click on the GeneralProjectInformation SubSection First TimeWhen Verify user can select value from the Project Type dropdownThen validate ResetBtn is EnableThen validate SaveBtn is EnablePassChecking the functionlity of Reset button under GeneralProjectInformation SubSectionWhen Validate user click on ResetButtonThen Validate ResetPage modal is popUpThen validate Reset message is display under pop ModalThen validate click on cancel button modal is disapearThen validate again user click on reset buttonThen validate user click on continue buttonPassChecking user can enter the value in textBox Or Fill the entire form under GeneralProjectInformation SubSectionPassChecking user can enter the value in textBox Or Fill the entire form under GeneralProjectInformation SubSectionWhen Verify user can select value from the TypeOfFacility dropdownThen Verify user can select value from the SupportingOffices dropdownThen Verify user can select radio button in RiskAssessmentCompleted fieldThen Verify user can enter value in ProposalProjectRiskScore Textbox "244"Then Verify user can enter value in ProposalProjectRiskLevel Textbox "233"Then Verify user can select value from the LeadOffice dropdownThen Verify user can enter the value in FacilityTechnology textBox "233"Then Verify user can enter value in ClientName Textbox "Client Name Automation"Then Verify user can select radio button from BrownAndGreen fieldThen Verify user can select radio button from AreThereForiegnContract fieldThen Verify user can select radio button from IsBlackAndVeatch fieldThen Validate ProjectLocation Ttile is displayThen Validate AddField IconText is displayThen Verify user can enter value in ProjectLocationState Textbox "Maharastra"Then Verify user can enter value in ProjectLocationCountry Textbox "India"Then Verify user can enter value in ProjectLocationCity Textbox "Pune"Then Validate KeyScheduleDates Ttile is displayThen Validate AddField IconText is displayThen Verify user can enter value in EstEngineeringTimeframe Textbox "35"Then Verify user can enter value in EstConstructionTimeframe Textbox "40"PassValidate when Moving from the page without saving a InformationWhen Validate user click on the projectScope SectionPassChecking the functionlity of save button under GeneralProjectInformation SubSectionWhen Validate user can Save the information by clicking on Save buttonThen validate CompleteBtn is EnablePassChecking the operation when user edit the formPassChecking the operation when user edit the formWhen Validate user enter the value in clientName field textbox "Client Name Testing"Then validate ResetBtn is EnableThen validate SaveBtn is EnableThen Validate user can Save the information by clicking on Save buttonPassChecking the operation of CompleteButtonWhen Validate user click on the complete buttonThen validate only Edit button is displayThen Vaidate the section have check next to the SectionThen Validate user click on the Edit buttonThen Validate check next to the Section is removedThen validate CompleteBttn is EnablePassChecking the functionality of Add additional Project Metadata FieldPassChecking the functionality of Add additional Project Metadata FieldWhen validate addField button is Display With BPD titleThen validate user click on AddField buttonThen validate user enter value in fieldName textBox ""Then Validate user select value from the valueType dropDownThen Validate user click on the cancel buttonThen validate PROJECTSETUP_TOPTEXT screen displayPassChecking the functionality of Add additional Project Metadata FieldWhen validate addField button is Display and clickThen validate user enter value in fieldName textBox "Testing"Then Validate user select value from the valueType dropDownThen Validate user click on the cancel buttonPassCheck when user save the blank add field formWhen validate user click on AddField iconThen validate user click on the save buttonThen validate filed validation eror message is displayPassCheck when user enter duplicate fieldName in Add Field Modal which is already used within ProjectInformationPassCheck when user enter duplicate fieldName in Add Field Modal which is already used within ProjectInformationWhen validate user enter duplicate field name "Project Location City"Then validate validation error message is displayThen Validate user select Numeric value from dropdownThen validate UOMType and UOM option is displayThen validate select value from the UOMType and UOM dropDown fieldThen Validate user enter fieldName "Testing Automation"Then Validate user click on the Save buttonThen validate added field is display under BasicProjectData sectionThen validate pencil icon for edit is displayPassCheck when user enter duplicate fieldName in Add Field Modal which is already used within ProjectInformationWhen validate user enter duplicate field name "2D Design Software"Then validate validation error message is displayThen Validate user select Numeric value from dropdownThen validate UOMType and UOM option is displayThen validate select value from the UOMType and UOM dropDown fieldThen Validate user enter fieldName "Testing Automation"Then Validate user click on the Save buttonThen validate added field is display under BasicProjectData sectionThen validate pencil icon for edit is displayPassChecking validation on Newly added numeric fieldPassChecking validation on Newly added numeric fieldWhen validate user enter alphabet in numeric field "Numeric Testing"Then Validate Validation error message is displaysThen validate enter only numeric value "444"Then Validate user click on the save buttonUSER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLYThen validate user click on complete buttonUSER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLYWhen validate Section is completed, a check next to the "General Project Information" label will display in left panelPassChecking validation on Newly added numeric fieldWhen validate user enter alphabet in numeric field "Numeric Testing"Then Validate Validation error message is displaysThen validate enter only numeric value "444"Then Validate user click on the save buttonUSER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLYThen validate user click on complete buttonUSER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLYThen validate Top ProjectInformation header is completed with cheked markThen closing the browserPassChecking all mendetory field of Project Scope sectionPassChecking all mendetory field of Project Scope sectionWhen Validate user click on the ProjectScope SubsectionThen validate user select and check all mendetory field in ProjectScope and click on save then complete "Automation Testing"Then Validate user click on the save buttonUSER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLYThen validate user click on complete buttonUSER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLYWhen validate Section is completed, a check next to the "Project Scope" label will display in left panelPassChecking all mendetory field of Technical Requirement sectionPassChecking all mendetory field of Technical Requirement sectionWhen Validate user click on the TechnicalRequirement sectionThen validate user select and check all mendetory field in TechnicalRequirement and click on save then complete "English Units","Test","6666"Then Validate user click on the save buttonUSER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLYThen validate user click on complete buttonUSER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLYWhen validate Section is completed, a check next to the "Technical Requirements" label will display in left panelPassChecking all mendetory field of Project Control sectionPassChecking all mendetory field of Project Control sectionWhen Validate user click on the project control sectionThen validate user select and check all mendetory field in projectControl "Automation Testing"When validate addField button is Display and clickThen Validate user click on the cancel buttonThen Validate user click on the save buttonUSER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLYThen validate user click on complete buttonUSER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLYWhen validate Section is completed, a check next to the "Project Controls" label will display in left panelPassChecking all mendetory field of Procurement sectionPassChecking all mendetory field of Procurement sectionWhen Validate user click on the Procurement sectionThen validate user select and check all mendetory field in Procurement Software "Automation Testing"When validate addField button is Display and clickThen Validate user click on the cancel buttonThen Validate user click on the save buttonUSER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLYThen validate user click on complete buttonUSER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLYWhen validate Section is completed, a check next to the "Procurement" label will display in left panelThen validate Top ProjectInformation header is completed with cheked markThen closing the browser -
Validating WBS Information Header PLI Role
09:27:58 AM / 00:03:32:651 Pass
Validating WBS Information Header PLI Role
06.03.2021 09:27:58 06.03.2021 09:31:30 00:03:32:651 · #test-id=310@WBSInformationPassValidate as a PLI role, user click on the WBSInformation HeaderPassValidate as a PLI role, user click on the WBSInformation HeaderGiven validate user login as a "RathodR@bv.com" roleUSER HAS LOGGED-IN SUCCESSFULLYThen validate user select newly created project cardPROJECT HAS BEEN SELECTED SUCCESSFULLYThen validate "WBS Information" header is clickedUSER HAS BEEN CLICKED ON HEADER SUCCESSFULLYPassValidate CWAList SubSection - User are able to Add new RowPassValidate CWAList SubSection - User are able to Add new RowThen validate user click on add row button and user enter the CWA Number and CWA Name "1234","Test123"Then Validate save button is enabledThen Validate user click on the save buttonUSER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLYThen validate complete button is enabledThen validate user click on complete buttonUSER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLYThen validate Section is completed, a check next to the "CWA List" label will display in left panelPassValidate ModuleList SubSection - User are able to Add new RowPassValidate ModuleList SubSection - User are able to Add new RowThen validate user click on "Module List"Then validate user click on add row button and user enter the Modulenumber and modulename and CWA Numbername "1234M","ModuleTest","1234-Test123"Then Validate save button is enabledThen Validate user click on the save buttonUSER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLYThen validate complete button is enabledThen validate user click on complete buttonUSER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLYThen validate Section is completed, a check next to the "Module List" label will display in left panelPassValidate PurchaseSpecificationList - user are able to Add new RowPassValidate PurchaseSpecificationList - user are able to Add new RowThen validate user click on "Purchase Specification List"Then validate user click on addRow button and user enter the value in PurchaseSpecificationNumber and PurchaseSpecificationName and Discipline column "61"Then Validate save button is enabledThen Validate user click on the save buttonUSER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLYThen validate complete button is enabledThen validate user click on complete buttonUSER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLYThen validate Section is completed, a check next to the "Purchase Specification List" label will display in left panelPassValidate Process Area List Section - User are able to Add new RowPassValidate Process Area List Section - User are able to Add new RowThen validate user click on "Process Area List"Then validate user click on addRow button and user enter the value in Process Area ID and Process Area Name "123","processName"Then Validate user click on the save buttonUSER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLYThen validate user click on complete buttonUSER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLYWhen The last section within the last header area with dependencies is being marked Complete, and it IS the LAST section of the LAST of two header areas to be marked complete, a popup will be displayed identifying the process that will be initiated if they continueThen validate Section is completed, a check next to the "Process Area List" label will display in left panelThen validate Top header is completed with cheked markThen closing the browser -
Validating ManHourBudget as a PLI Role
09:31:30 AM / 01:06:54:616 Pass
Validating ManHourBudget as a PLI Role
06.03.2021 09:31:30 06.03.2021 10:38:25 01:06:54:616 · #test-id=362PassValidate Piping SectionPassValidate Piping SectionGiven validate user login as a "RathodR@bv.com" roleUSER HAS LOGGED-IN SUCCESSFULLYThen validate user select newly created project cardPROJECT HAS BEEN SELECTED SUCCESSFULLYThen validate "Manhour Budget" header is clickedUSER HAS BEEN CLICKED ON HEADER SUCCESSFULLYPassValidate Piping SectionThen validate user fill the data in "Tie-In List And Details","25","","",""Then Validate user click on the save buttonUSER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLYThen validate user click on complete buttonUSER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLYWhen validate Section is completed, a check next to the "Piping" label will display in left panelPassValidate Electrical SectionPassValidate Electrical SectionThen validate user click on "Electrical"Then validate user fill the data in "Electrical Load List excluding Voltage Drop Calculations","25","","",""Then Validate user click on the save buttonUSER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLYThen validate user click on complete buttonUSER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLYWhen validate Section is completed, a check next to the "Electrical" label will display in left panelPassValidate I&C SectionPassValidate I&C SectionThen validate user click on "I&C"Then validate user fill the data in "Instrument Index","25","","",""Then Validate user click on the save buttonUSER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLYThen validate user click on complete buttonUSER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLYWhen validate Section is completed, a check next to the "I&C" label will display in left panelPassValidate Structural SectionPassValidate Structural SectionThen validate user click on "Structural"Then validate user fill the data in "Piling Detail Drawings","25","","",""Then Validate user click on the save buttonUSER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLYThen validate user click on complete buttonUSER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLYWhen validate Section is completed, a check next to the "Structural" label will display in left panelPassValidate Process SectionPassValidate Process SectionThen validate user click on "Process"Then validate user fill the data in "Line Schedule","25","","",""Then Validate user click on the save buttonUSER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLYThen validate user click on complete buttonUSER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLYWhen validate Section is completed, a check next to the "Process" label will display in left panelPassValidate Process SectionWhen validate user updateORenter value in Design Review Facilitation Textbox "Test","TestAuto"When validate addField button is Display and clickThen validate user enter value in fieldName textBox "Testing Automation"Then Validate user select value from the valueType dropDownThen Validate user click on the Save buttonWhen validate user enter alphabet in numeric field "Testing"Then Validate user click on the save buttonUSER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLYThen validate user click on complete buttonUSER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLYWhen validate Section is completed, a check next to the "Process" label will display in left panelThen validate Top ProjectInformation header is completed with cheked markThen closing the browserPassValidate Equipment SectionPassValidate Equipment SectionThen validate user click on "Equipment"Then validate user fill the data in "Mechanical Data Sheets","25","","",""Then Validate user click on the save buttonUSER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLYThen validate user click on complete buttonUSER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLYWhen The last section within the last header area with dependencies is being marked Complete, and it IS the LAST section of the LAST of two header areas to be marked complete, a popup will be displayed identifying the process that will be initiated if they continueWhen validate Section is completed, a check next to the "Equipment" label will display in left panelThen validate manHourBudget header is completed with cheked markThen closing the browser -
Reference Library as a PLI Role
09:34:59 AM / 02:18:35:057 Fail
Reference Library as a PLI Role
06.03.2021 09:34:59 06.03.2021 11:53:34 02:18:35:057 · #test-id=425@ReferenceLibraryFailValidate loginFailValidate loginGiven validate user login as a "RathodR@bv.com" roleUSER HAS LOGGED-IN SUCCESSFULLYThen validate "Reference Library" header is clickedcom.wipro.qa.stepDefinitions.ProjectInformationStep.embedScreenshot(io.cucumber.java.Scenario)Failed ScreenShot TakenPassValidate loginGiven validate user login as a "equipment@bv.com" roleUSER HAS LOGGED-IN SUCCESSFULLYThen validate user select newly created project cardPROJECT HAS BEEN SELECTED SUCCESSFULLYThen validate "WBS Information" header is clickedUSER HAS BEEN CLICKED ON HEADER SUCCESSFULLYPassValidate loginGiven validate user login as a "equipment@bv.com" roleUSER HAS LOGGED-IN SUCCESSFULLYThen validate user select newly created project cardPROJECT HAS BEEN SELECTED SUCCESSFULLYThen validate "Reference Library" header is clickedUSER HAS BEEN CLICKED ON HEADER SUCCESSFULLYPassValidate loginGiven validate user login as a "equipment@bv.com" roleUSER HAS LOGGED-IN SUCCESSFULLYThen validate user select newly created project cardPROJECT HAS BEEN SELECTED SUCCESSFULLYThen validate "Assign Team" header is clickedUSER HAS BEEN CLICKED ON HEADER SUCCESSFULLYPassValidate loginGiven validate user login as a "equipment@bv.com" roleUSER HAS LOGGED-IN SUCCESSFULLYThen validate user select newly created project cardPROJECT HAS BEEN SELECTED SUCCESSFULLYThen validate "Project Activities" header is clickedUSER HAS BEEN CLICKED ON HEADER SUCCESSFULLYFailValidate loginGiven validate user login as a "equipment@bv.com" roleUSER HAS LOGGED-IN SUCCESSFULLYThen validate user select newly created project cardPROJECT HAS BEEN SELECTED SUCCESSFULLYThen validate "" header is clicked com.wipro.qa.stepDefinitions.ProjectInformationStep.embedScreenshot(io.cucumber.java.Scenario)Failed ScreenShot TakenPassValidate loginGiven validate user login as a "process@bv.com" roleUSER HAS LOGGED-IN SUCCESSFULLYThen validate user select newly created project cardPROJECT HAS BEEN SELECTED SUCCESSFULLYThen validate "Project Information" header is clickedUSER HAS BEEN CLICKED ON HEADER SUCCESSFULLYPassValidate loginGiven validate user login as a "process@bv.com" roleUSER HAS LOGGED-IN SUCCESSFULLYThen validate user select newly created project cardPROJECT HAS BEEN SELECTED SUCCESSFULLYThen validate "WBS Information" header is clickedUSER HAS BEEN CLICKED ON HEADER SUCCESSFULLYPassValidate loginGiven validate user login as a "process@bv.com" roleUSER HAS LOGGED-IN SUCCESSFULLYThen validate user select newly created project cardPROJECT HAS BEEN SELECTED SUCCESSFULLYThen validate "Reference Library" header is clickedUSER HAS BEEN CLICKED ON HEADER SUCCESSFULLYPassValidate loginGiven validate user login as a "process@bv.com" roleUSER HAS LOGGED-IN SUCCESSFULLYThen validate user select newly created project cardPROJECT HAS BEEN SELECTED SUCCESSFULLYThen validate "Assign Team" header is clickedUSER HAS BEEN CLICKED ON HEADER SUCCESSFULLYPassValidate loginGiven validate user login as a "process@bv.com" roleUSER HAS LOGGED-IN SUCCESSFULLYThen validate user select newly created project cardPROJECT HAS BEEN SELECTED SUCCESSFULLYThen validate "Project Activities" header is clickedUSER HAS BEEN CLICKED ON HEADER SUCCESSFULLYPassValidate loginGiven validate user login as a "process@bv.com" roleUSER HAS LOGGED-IN SUCCESSFULLYThen validate user select newly created project cardPROJECT HAS BEEN SELECTED SUCCESSFULLYThen validate "View/Approve Project Plan" header is clickedUSER HAS BEEN CLICKED ON HEADER SUCCESSFULLYPassValidate loginGiven validate user login as a "piping@bv.com" roleUSER HAS LOGGED-IN SUCCESSFULLYThen validate user select newly created project cardPROJECT HAS BEEN SELECTED SUCCESSFULLYThen validate "Reference Library" header is clickedUSER HAS BEEN CLICKED ON HEADER SUCCESSFULLYPassValidate loginGiven validate user login as a "piping@bv.com" roleUSER HAS LOGGED-IN SUCCESSFULLYThen validate user select newly created project cardPROJECT HAS BEEN SELECTED SUCCESSFULLYThen validate "Assign Team" header is clickedUSER HAS BEEN CLICKED ON HEADER SUCCESSFULLYPassValidate loginGiven validate user login as a "piping@bv.com" roleUSER HAS LOGGED-IN SUCCESSFULLYThen validate user select newly created project cardPROJECT HAS BEEN SELECTED SUCCESSFULLYThen validate "Project Activities" header is clickedUSER HAS BEEN CLICKED ON HEADER SUCCESSFULLYPassValidate loginGiven validate user login as a "piping@bv.com" roleUSER HAS LOGGED-IN SUCCESSFULLYThen validate user select newly created project cardPROJECT HAS BEEN SELECTED SUCCESSFULLYThen validate "View/Approve Project Plan" header is clickedUSER HAS BEEN CLICKED ON HEADER SUCCESSFULLYFailValidate Project-Specific Documents - Management sectionsFailValidate Project-Specific Documents - Management sectionsWhen Validate user when moving the slider to on positionThen validate moving the slider to on position only editing of name "Automation" and ID, deletingorpasting of Link "https://www.google.com/" allowedThen Validate Hovering over link cell will display entire linkThen Validate user can save the updated data and link will become a hyperlink to open the file or websiteStep skippedThen Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X iconStep skippedWhen validate user click on AddReference buttonStep skippedThen validate Newly added row can be saved with categoryName and without ID or link "Automation Category"Step skippedThen Validate user click on the save buttonStep skippedThen validate user click on complete buttonStep skippedWhen validate Section is completed, a check next to the "Project-Specific Documents - Management" label will display in left panelStep skippedcom.wipro.qa.stepDefinitions.ProjectInformationStep.embedScreenshot(io.cucumber.java.Scenario)Failed ScreenShot TakenFailValidate ClientDocumentManagementSection sectionsFailValidate ClientDocumentManagementSection sectionsThen validate user click on "Client Documents - Management"When validate user click on AddReference buttonStep skippedThen validate Newly added row can be saved with categoryName and without ID or link "Automation Category"Step skippedThen validate moving the slider to on position only editing of name "Automation" and ID, deletingorpasting of Link "https://www.google.com/" allowedStep skippedThen Validate user click on the save buttonStep skippedThen validate user click on complete buttonStep skippedWhen validate Section is completed, a check next to the "Client Documents - Management" label will display in left panelStep skippedcom.wipro.qa.stepDefinitions.ProjectInformationStep.embedScreenshot(io.cucumber.java.Scenario)Failed ScreenShot TakenFailValidate ProcedureManagement sectionFailValidate ProcedureManagement sectionThen validate user click on "Procedures - Management"When Validate user when moving the slider to on positionStep skippedThen validate moving the slider to on position only deletingorpasting of link allowed in ProcedureManagement "https://www.google.com/"Step skippedThen Validate Hovering over link cell will display entire linkStep skippedThen Validate user can save the updated data and link will become a hyperlink to open the file or websiteStep skippedThen Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X iconStep skippedWhen validate user click on AddReference buttonStep skippedThen validate Newly added row can be saved with name "Automation Name" only and without ID or linkStep skippedThen Validate user click on the save buttonStep skippedThen validate user click on complete buttonStep skippedWhen validate Section is completed, a check next to the "Procedures - Management" label will display in left panelStep skippedcom.wipro.qa.stepDefinitions.ProjectInformationStep.embedScreenshot(io.cucumber.java.Scenario)Failed ScreenShot TakenFailValidate manualsHandbooksManagement sectionsFailValidate manualsHandbooksManagement sectionsThen validate user click on "Manuals/Handbooks - Management"When Validate user when moving the slider to on positionStep skippedThen validate moving the slider to on position only deletingorpasting of link allowed in ProcedureManagement "https://www.google.com/"Step skippedThen Validate Hovering over link cell will display entire linkStep skippedThen Validate user can save the updated data and link will become a hyperlink to open the file or websiteStep skippedThen Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X iconStep skippedWhen validate user click on AddReference buttonStep skippedThen validate Newly added row can be saved with name "Automation Name" only and without ID or linkStep skippedThen Validate user click on the save buttonStep skippedThen validate user click on complete buttonStep skippedWhen validate Section is completed, a check next to the "Manuals/Handbooks - Management" label will display in left panelStep skippedcom.wipro.qa.stepDefinitions.ProjectInformationStep.embedScreenshot(io.cucumber.java.Scenario)Failed ScreenShot TakenFailValidate OtherManagement sectionsFailValidate OtherManagement sectionsThen validate user click on "Other - Management"When Validate user when moving the slider to on positionStep skippedThen validate moving the slider to on position only deletingorpasting of link allowed in ProcedureManagement "https://www.google.com/"Step skippedThen Validate Hovering over link cell will display entire linkStep skippedThen Validate user can save the updated data and link will become a hyperlink to open the file or websiteStep skippedThen Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X iconStep skippedWhen validate user click on AddReference buttonStep skippedThen validate Newly added row can be saved with name "Automation Name" only and without ID or linkStep skippedThen Validate user click on the save buttonStep skippedThen validate user click on complete buttonStep skippedWhen validate Section is completed, a check next to the "Other - Management" label will display in left panelStep skippedcom.wipro.qa.stepDefinitions.ProjectInformationStep.embedScreenshot(io.cucumber.java.Scenario)Failed ScreenShot TakenFailValidate checklistsManagement sectionsFailValidate checklistsManagement sectionsThen validate user click on "Checklists - Management"When Validate user when moving the slider to on positionStep skippedThen Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X iconStep skippedThen validate moving the slider to on position only deletingorpasting of link allowed in ProcedureManagement "https://www.google.com/"Step skippedThen Validate Hovering over link cell will display entire linkStep skippedThen Validate user can save the updated data and link will become a hyperlink to open the file or websiteStep skippedWhen validate user click on AddReference buttonStep skippedThen validate Newly added row can be saved with name "Automation Name" only and without ID or linkStep skippedThen Validate user click on the save buttonStep skippedThen validate user click on complete buttonStep skippedWhen validate Section is completed, a check next to the "Checklists - Management" label will display in left panelStep skippedThen validate Top ReferenceLibrary header is completed with cheked markStep skippedThen closing the browserStep skippedcom.wipro.qa.stepDefinitions.ProjectInformationStep.embedScreenshot(io.cucumber.java.Scenario)Failed ScreenShot Taken -
WorkflowRule for PLI Role
09:39:54 AM / 00:00:52:031 Fail
WorkflowRule for PLI Role
06.03.2021 09:39:54 06.03.2021 09:40:47 00:00:52:031 · #test-id=519FailValidate As a PLI Define Workflow Rules: View and update FragnetStep durations and Define Workflow Rules: Select Applicable FragnetStep TypesFailValidate As a PLI Define Workflow Rules: View and update FragnetStep durations and Define Workflow Rules: Select Applicable FragnetStep TypesGiven validate user login as a "RathodR@bv.com" roleUSER HAS LOGGED-IN SUCCESSFULLYThen validate "Workflow Rules" header is clickedThen validate If the box is unselected, upon hovering over a box, a select button appearsStep skippedThen validate Upon selecting FragnetStep boxes, I can view the default durations tied to each stepStep skippedThen validate when a duration needs to be changed, I can edit the durations by selecting the duration fieldStep skippedThen validate PLI is displayed a generic workflow with Create, and Issue for Construction static; In-House Review, Client Review, Combined IHR & Client Review, and 3rd-Party Review are selectableStep skippedThen validate If In-House Review or Client Review is selected, Combined IHR & Client Review CANNOT be selected and vice versaStep skippedThen validate If the box is selected, upon hovering over a box, a deselect button appearsStep skippedThen validate Deselecting box removed check from upper left corner.Step skippedThen Validate user click on the save buttonStep skippedThen validate user click on complete buttonStep skippedWhen The last section within the last header area with dependencies is being marked Complete, and it IS the LAST section of the LAST of two header areas to be marked complete, a popup will be displayed identifying the process that will be initiated if they continueStep skippedThen validate Top defineWorkFlow header is completed with cheked markStep skippedThen closing the browserStep skippedcom.wipro.qa.stepDefinitions.ProjectInformationStep.embedScreenshot(io.cucumber.java.Scenario)Failed ScreenShot Taken -
Project Information as a DPS Equipment Role
09:40:47 AM / 00:00:59:290 Pass
Project Information as a DPS Equipment Role
06.03.2021 09:40:47 06.03.2021 09:41:46 00:00:59:290 · #test-id=538@projectInformationPassValidate Equipment disciplinePassValidate Equipment disciplineGiven validate user login as a "equipment@bv.com" roleUSER HAS LOGGED-IN SUCCESSFULLYThen validate user select newly created project cardPROJECT HAS BEEN SELECTED SUCCESSFULLYThen validate "Project Information" header is clickedUSER HAS BEEN CLICKED ON HEADER SUCCESSFULLYThen closing the browser -
Validating WBS Information Header Equipment Role
09:41:46 AM / 00:01:44:484 Pass
Validating WBS Information Header Equipment Role
06.03.2021 09:41:46 06.03.2021 09:43:30 00:01:44:484 · #test-id=547@wbsInformationPassValidate Mechenical Equipment ListPassValidate Mechenical Equipment ListThen validate viewing data that needs to be updated, I can click on addRow button to addORupdate the data and changes have been made on the screen the Save button enable "AutoTag","Autoequipment","Pump","61-Civil/Structural Equipment and Materials","123","123"Then Validate user click on the save buttonUSER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLYThen validate user click on complete buttonUSER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLYWhen The last section within the last header area with dependencies is being marked Complete, and it IS the LAST section of the LAST of two header areas to be marked complete, a popup will be displayed identifying the process that will be initiated if they continueThen validate Section is completed, a check next to the "Mechanical Equipment List" label will display in left panelThen validate Top header is completed with cheked markThen closing the browser -
Reference Library as a Equipment role
09:43:30 AM / 00:09:27:577 Fail
Reference Library as a Equipment role
06.03.2021 09:43:30 06.03.2021 09:52:58 00:09:27:577 · #test-id=565FailValidate ProjectSpecificDocumentsEquipment sectionsFailValidate ProjectSpecificDocumentsEquipment sectionsWhen Validate user when moving the slider to on positionThen validate moving the slider to on position only editing of name "Automation" and ID, deletingorpasting of Link "https://www.google.com/" allowedThen Validate Hovering over link cell will display entire linkThen Validate user can save the updated data and link will become a hyperlink to open the file or websiteThen Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X iconWhen validate user click on AddReference buttonStep skippedThen validate Newly added row can be saved with categoryName and without ID or link "Automation Category"Step skippedThen Validate user click on the save buttonStep skippedThen validate user click on complete buttonStep skippedWhen validate Section is completed, a check next to the "Project-Specific Documents - Equipment" label will display in left panelStep skippedcom.wipro.qa.stepDefinitions.ProjectInformationStep.embedScreenshot(io.cucumber.java.Scenario)Failed ScreenShot TakenPassValidate ClientDocumentEquipmentSection sectionsPassValidate ClientDocumentEquipmentSection sectionsThen validate user click on "Client Documents - Equipment"When validate user click on AddReference buttonThen validate Newly added row can be saved with categoryName and without ID or link "Automation Category"Then validate moving the slider to on position only editing of name "Automation" and ID, deletingorpasting of Link "https://www.google.com/" allowedThen Validate user click on the save buttonUSER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLYThen validate user click on complete buttonUSER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLYWhen validate Section is completed, a check next to the "Client Documents - Equipment" label will display in left panelFailValidate ProceduresEquipment sectionFailValidate ProceduresEquipment sectionThen validate user click on "Procedures - Equipment"When Validate user when moving the slider to on positionThen validate moving the slider to on position only deletingorpasting of link allowed in ProcedureManagement "https://www.google.com/"Then Validate Hovering over link cell will display entire linkThen Validate user can save the updated data and link will become a hyperlink to open the file or websiteThen Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X iconWhen validate user click on AddReference buttonStep skippedThen validate Newly added row can be saved with name "Automation Name" only and without ID or linkStep skippedThen Validate user click on the save buttonStep skippedThen validate user click on complete buttonStep skippedWhen validate Section is completed, a check next to the "Procedures - Equipment" label will display in left panelStep skippedcom.wipro.qa.stepDefinitions.ProjectInformationStep.embedScreenshot(io.cucumber.java.Scenario)Failed ScreenShot TakenPassValidate calculationTemplatesEquipment sectionsPassValidate calculationTemplatesEquipment sectionsThen validate user click on "Calculation Templates - Equipment"When validate user click on AddReference buttonThen validate Newly added row can be saved with name "Automation" only and without ID or linkThen Validate user click on the save buttonUSER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLYThen validate moving the slider to on position only deletingorpasting of link allowed in ProcedureManagement "https://www.google.com/"Then validate user click on complete buttonUSER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLYWhen validate Section is completed, a check next to the "Calculation Templates - Equipment" label will display in left panelFailValidate typicalDetailsEquipment sectionsFailValidate typicalDetailsEquipment sectionsThen validate user click on "Typical Details - Equipment"When Validate user when moving the slider to on positionThen validate moving the slider to on position only deletingorpasting of link allowed in ProcedureManagement "https://www.google.com/"Then Validate Hovering over link cell will display entire linkThen Validate user can save the updated data and link will become a hyperlink to open the file or websiteThen Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X iconWhen validate user click on AddReference buttonStep skippedThen validate Newly added row can be saved with name "Automation Name" only and without ID or linkStep skippedThen Validate user click on the save buttonStep skippedThen validate user click on complete buttonStep skippedWhen validate Section is completed, a check next to the "Typical Details - Equipment" label will display in left panelStep skippedcom.wipro.qa.stepDefinitions.ProjectInformationStep.embedScreenshot(io.cucumber.java.Scenario)Failed ScreenShot TakenPassValidate ManualsHandbooksEquipment sectionsPassValidate ManualsHandbooksEquipment sectionsThen validate user click on "Manuals/Handbooks - Equipment"When Validate user when moving the slider to on positionThen validate moving the slider to on position only deletingorpasting of link allowed in ProcedureManagement "https://www.google.com/"Then Validate Hovering over link cell will display entire linkThen Validate user can save the updated data and link will become a hyperlink to open the file or websiteThen Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X iconWhen validate user click on AddReference buttonThen validate Newly added row can be saved with name "Automation Name" only and without ID or linkThen Validate user click on the save buttonUSER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLYThen validate user click on complete buttonUSER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLYWhen validate Section is completed, a check next to the "Manuals/Handbooks - Equipment" label will display in left panelPassValidate trainingEquipment sectionsPassValidate trainingEquipment sectionsThen validate user click on "Training - Equipment"When validate user click on AddReference buttonThen validate Newly added row can be saved with name "Automation" only and without ID or linkThen Validate user click on the save buttonUSER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLYThen validate user click on complete buttonUSER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLYWhen validate Section is completed, a check next to the "Training - Equipment" label will display in left panelPassValidate otherEquipment sectionsPassValidate otherEquipment sectionsThen validate user click on "Other - Equipment"When validate user click on AddReference buttonThen validate Newly added row can be saved with name "Automation" only and without ID or linkThen Validate user click on the save buttonUSER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLYThen validate user click on complete buttonUSER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLYWhen validate Section is completed, a check next to the "Other - Equipment" label will display in left panelFailValidate checklistsEquipment sectionsFailValidate checklistsEquipment sectionsThen validate user click on "Checklists - Equipment"When validate user click on AddReference buttonThen validate Newly added row can be saved with name "Automation" only and without ID or linkThen Validate user click on the save buttonUSER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLYThen validate user click on complete buttonUSER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLYWhen validate Section is completed, a check next to the "Checklists - Equipment" label will display in left panelThen validate Top ReferenceLibrary header is completed with cheked markThen closing the browserStep skippedcom.wipro.qa.stepDefinitions.ProjectInformationStep.embedScreenshot(io.cucumber.java.Scenario)Failed ScreenShot Taken -
Validating AssignTeam Header as a EquipmentRole
09:52:58 AM / 01:52:01:475 Pass
Validating AssignTeam Header as a EquipmentRole
06.03.2021 09:52:58 06.03.2021 11:45:00 01:52:01:475 · #test-id=685PassValidate EquipmentTeamLeads Section: Select Roles and add professional name and NavigationPassValidate EquipmentTeamLeads Section: Select Roles and add professional name and NavigationWhen validate "Equipment Team Leads" section is NOT completed, an empty circle next to the Section label will display in left panelWhen validate toggle is ON and the name field will enableWhen validate entering the assignee name, it will search for matching names and display NameJobFamilyOffice "john doe / Lead / Wipro"Then Validate user click on the save buttonUSER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLYWhen validate upon making an edit, the Save button will be enabled and the Complete button will be disable "Ramesh Chander / null / undefined"When validate System will prompt user to save record if user is moving away from sectionscreen to "Equipment Team" without saving dataWhen validate the section information has been saved and the Complete button will be enabledWhen validate toggling off a role with a name populated the name will clear and field will disableWhen validate For select roles, user can select +Add Professional which will create a new blank field to populate an additional professional for a given role "john doe / Lead / Wipro","Ramesh Chander / null / undefined"Then Validate user click on the save buttonUSER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLYWhen validate a section within a header area that does not have dependencies Project Information, Project Reference Library, Assign Project Lead has been marked complete, the Reset, Save and Complete buttons will be replaced with an Edit buttonWhen validate Section is completed, a check next to the "Equipment Team Leads" label will display in left panelThen Validate user click on the Edit buttonWhen validate clicking on Define User Permissions displays a list of user permissions so that I can assign an individual in Discipline "john doe / Lead / Wipro"Then validate hovering over i icon next to user permissions provides additional informationORdescription of permissionsThen validate user can select Save to save the selectionsPassValidate EquipmentTeam Section: Select Roles and add professional name and NavigationPassValidate EquipmentTeam Section: Select Roles and add professional name and NavigationThen validate user click on "Equipment Team"When validate "Equipment Team" section is NOT completed, an empty circle next to the Section label will display in left panelWhen validate toggle is ON and the name field will enableWhen validate entering the assignee name, it will search for matching names and display NameJobFamilyOffice "namita gauri / Technical Lead / Wipro"Then Validate user click on the save buttonUSER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLYWhen validate upon making an edit, the Save button will be enabled and the Complete button will be disable "kaushikee bhawsar / Project Engineer / Wipro"When validate System will prompt user to save record if user is moving away from sectionscreen to "Equipment Team Leads" without saving dataWhen validate the section information has been saved and the Complete button will be enabledWhen validate toggling off a role with a name populated the name will clear and field will disableWhen validate For select roles, user can select +Add Professional which will create a new blank field to populate an additional professional for a given role "namita gauri / Technical Lead / Wipro","kaushikee bhawsar / Project Engineer / Wipro"Then Validate user click on the save buttonUSER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLYWhen validate a section within a header area that does not have dependencies Project Information, Project Reference Library, Assign Project Lead has been marked complete, the Reset, Save and Complete buttons will be replaced with an Edit buttonWhen validate Section is completed, a check next to the "Equipment Team" label will display in left panelThen Validate user click on the Edit buttonWhen validate clicking on Define User Permissions displays a list of user permissions so that I can assign an individual in Discipline "namita gauri / Technical Lead / Wipro"Then validate hovering over i icon next to user permissions provides additional informationORdescription of permissionsThen validate user can select Save to save the selectionsPassValidate Add Project RolePassValidate Add Project RoleThen validate user click on "Equipment Team Leads"Then valiate user click on the Edit buttonWhen verify that user is able add new role and view added Role "Automation Role","Testing Automation..."Then Validate user click on the save buttonUSER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLYThen validate user click on complete buttonUSER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLYThen closing the browserPassValidate Add Project RoleThen validate user click on "Process Team Leads"Then valiate user click on the Edit buttonWhen verify that user is able add new role and view added Role "Automation Role","Testing Automation..."Then Validate user click on the save buttonUSER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLYThen validate user click on complete buttonUSER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLYThen closing the browserPassValidate Add Project RoleThen validate user click on "Piping Team Leads"Then valiate user click on the Edit buttonWhen verify that user is able add new role and view added Role "Automation Role","Testing Automation..."Then Validate user click on the save buttonUSER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLYThen validate user click on complete buttonUSER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLYThen closing the browser -
Validating Project Activity Header as a Equipment Role
10:00:11 AM / 01:48:10:259 Pass
Validating Project Activity Header as a Equipment Role
06.03.2021 10:00:11 06.03.2021 11:48:21 01:48:10:259 · #test-id=743PassValidate Define ActivitiesPassValidate Define ActivitiesThen Verify when user clicks on Generate Project ActivitiesThen After including required activities and DPS clicks on Save buttonThen validate DPS can Add a Project Activity to DOS Activity section by selecting a plus Add Row button at the bottom of the table and by saving the activity, New row should be added below all the Activities "6655-4433"Then Verify DPS is able to edit the Activity name in the Activities list "3322edit"Then Verify when DPS selects multiple values from dropdown in WBS related fields in processThen Verify DPS is able to delete an Activity from Activity listThen Validate user click on the save buttonUSER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLYThen To verify All DOS activities complete for processThen validate user click on complete buttonUSER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLYPassValidate Define ActivitiesThen Verify when user clicks on Generate Project ActivitiesThen After including required activities and DPS clicks on Save buttonThen validate DPS can Add a Project Activity to DOS Activity section by selecting a plus Add Row button at the bottom of the table and by saving the activity, New row should be added below all the Activities "6655-4433"Then Verify DPS is able to edit the Activity name in the Activities list "3322edit"Then Verify DPS is able to delete an Activity from Activity listThen Validate user click on the save buttonUSER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLYThen To verify Mark DOS activity complete for processThen validate edit Project Activity after DOS activity marked complete and again complete the DOS activityThen validate user click on complete buttonUSER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLYPassValidate Define ActivitiesThen Verify when user clicks on Generate Project ActivitiesThen After including required activities and DPS clicks on Save buttonThen validate DPS can Add a Project Activity to DOS Activity section by selecting a plus Add Row button at the bottom of the table and by saving the activity, New row should be added below all the Activities "6655-4433"Then Verify DPS is able to edit the Activity name in the Activities list "3322edit"Then Verify when DPS selects multiple values from dropdown in WBS related fieldsThen Verify DPS is able to delete an Activity from Activity listThen To verify Mark DOS activity completeThen validate edit Project Activity after DOS activity marked complete and again complete the DOS activityThen validate user click on complete buttonUSER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLYPassValidate ManHour BudgetPassValidate ManHour BudgetWhen validate user clicks on ManHour Budgets sectionThen validate field validation by passing the decimal value into field "10.5"Then validate user fill the equal data into each field of DOS Activity and then check the total of hours "25","","",""Then Validate user click on the save buttonUSER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLYThen To verify Mark DOS activity completeThen validate user click on complete buttonUSER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLYThen closing the browserPassValidate ManHour BudgetWhen validate user clicks on ManHour Budgets sectionThen validate field validation by passing the decimal value into field "10.5"Then validate user fill the equal data into each field of DOS Activity and then check the total of hours "25","","",""Then Validate user click on the save buttonUSER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLYThen To verify Mark DOS activity completeThen validate user click on complete buttonUSER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLYThen closing the browserPassValidate ManHour BudgetWhen validate user clicks on ManHour Budgets sectionThen validate field validation by passing the decimal value into field "10.5"Then validate user fill the equal data into each field of DOS Activity and then check the total of hours "25","","",""Then Validate user click on the save buttonUSER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLYThen To verify Mark DOS activity completeThen validate user click on complete buttonUSER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLYThen closing the browser -
Gig Workflows as a Equipment role
10:03:20 AM / 00:32:00:203 Fail
Gig Workflows as a Equipment role
06.03.2021 10:03:20 06.03.2021 10:35:20 00:32:00:203 · #test-id=774FailCompleted all the the five steps on Gig Worflow Landing pageFailCompleted all the the five steps on Gig Worflow Landing pageGiven validate user login as a "equipment@bv.com" roleUSER HAS LOGGED-IN SUCCESSFULLYThen validate user select newly created project cardPROJECT HAS BEEN SELECTED SUCCESSFULLYAnd user select giga workflow from top menuAnd user select the option gig workflow dropdownAnd user select activity informationActivity Activity Information And user click edit button to edit existing details.And user fill activity information formAnd user select Customize FragnetActivity Customize Fragnet And user click edit button and change fileds on customize fragnet pageAnd user click save continue buttonAnd user select FragnetStepInformation tabActivity FragnetStep Information And user click edit button and change fileds on FragnetStepInformationAnd user click save continue buttonAnd User selects Stepfour Customize GignetAnd user click edit button for editAnd user remove all selected customie gignetPrepare & Issue Mech Equip Data Sheets Rev 0 Update & Issue Mech Equip Data Sheets Rev 1 Update & Issue Mech Equip Data Sheets Rev 2 And user fill values and completed stepfour Customize Gignet and save continue allprocessPrepare & Issue Mech Equip Data Sheets Rev 0 Update & Issue Mech Equip Data Sheets Rev 1 Update & Issue Mech Equip Data Sheets Rev 2 And user select StepFive Gig InformationActivity Gignet Giginfo And user click edit button for editAnd user remove all selected GiginformationPrepare & Issue Mech Equip Data Sheets Rev 0 Update & Issue Mech Equip Data Sheets Rev 1 Update & Issue Mech Equip Data Sheets Rev 2 And user selects Selected values in Stepfive and complete slide menu on Gig informationPrepare & Issue Mech Equip Data Sheets Rev 0 Review Process Datasheets,Prepare Draft Mechanical Datasheets,Check Draft Mechanical Datasheets,Setup IHR Session For Mechanical Datasheets,Conduct IHR For Mechanical DatasheetsSPACE,Resolve IHR Comments For Mechanical DatasheetsSPACE,Pe Stamp Datasheets,Issue Of PE Stamped DatasheetsSPACE,Heat Exchanger 2D CAD Sketches Update & Issue Mech Equip Data Sheets Rev 1 Review Process Datasheets,Tanks 2D CAD Sketches,Vessels 2D CAD Sketches,Heat Exchanger 2D CAD Sketches,3D Modeling And Asme Code Calculations,HTRI Modeling And Code Calculations,Prepare Draft Mechanical Datasheets,Check Draft Mechanical Datasheets,Setup IHR Session For Mechanical Datasheets,Conduct IHR For Mechanical DatasheetsSPACE,Resolve IHR Comments For Mechanical DatasheetsSPACE,Pe Stamp Datasheets,Issue Of PE Stamped DatasheetsSPACE Update & Issue Mech Equip Data Sheets Rev 2 Review Process Datasheets,Tanks 2D CAD Sketches,Vessels 2D CAD Sketches,Heat Exchanger 2D CAD Sketches,3D Modeling And Asme Code Calculations,HTRI Modeling And Code Calculations,Prepare Draft Mechanical Datasheets,Check Draft Mechanical Datasheets,Setup IHR Session For Mechanical Datasheets,Conduct IHR For Mechanical DatasheetsSPACE,Resolve IHR Comments For Mechanical DatasheetsSPACE,Pe Stamp Datasheets,Issue Of PE Stamped DatasheetsSPACE com.wipro.qa.stepDefinitions.ProjectInformationStep.embedScreenshot(io.cucumber.java.Scenario)Failed ScreenShot Taken -
Validating View/Approve Project Plan Header as a Equipment role
10:35:21 AM / 01:20:10:561 Fail
Validating View/Approve Project Plan Header as a Equipment role
06.03.2021 10:35:21 06.03.2021 11:55:31 01:20:10:561 · #test-id=800FailValidate View/Approve Project Plan HeaderFailValidate View/Approve Project Plan HeaderThen verify the Day Scale in Preliminary Discipline Plan "Day","Week","Month"Then verify user apply the filter by clicking on the filter icon "" Step skippedThen validate DPS user will select Project Activity gantt view full page form "Mechanical Data Sheets-61-Civil/Structural Equipment and Materials-Pump-AutoTag-Autoequipment"Step skippedThen verify the Project Activity details when clicking on ViewEdit Full Information LinkStep skippedThen validate DPS user will check editing permissions from the "Mechanical Data Sheets-61-Civil/Structural Equipment and Materials-Pump-AutoTag-Autoequipment" gantt view full page formStep skippedThen verify when projectUser clicks on BackStep skippedThen validate DPS user will select FragnetStep gantt view full page form "Prepare & Issue Mech Equip Data Sheets Rev 0"Step skippedThen verify the Project Activity details when clicking on ViewEdit Full Information LinkStep skippedThen validate DPS user will check editing permissions from the "Prepare & Issue Mech Equip Data Sheets Rev 0" gantt view full page formStep skippedThen verify when projectUser clicks on BackStep skippedThen validate DPS user will select Gig gantt view full page form "Review Process Datasheets"Step skippedThen verify the Project Activity details when clicking on ViewEdit Full Information LinkStep skippedThen validate DPS user will check editing permissions from the "Review Process Datasheets" gantt view full page formStep skippedThen verify when projectUser clicks on BackStep skippedThen validate user click on complete buttonStep skippedThen closing the browserStep skippedcom.wipro.qa.stepDefinitions.ProjectInformationStep.embedScreenshot(io.cucumber.java.Scenario)Failed ScreenShot TakenPassValidate View/Approve Project Plan HeaderThen verify the Day Scale in Preliminary Discipline Plan "Day","Week","Month"Then verify user apply the filter by clicking on the filter icon "" Then validate DPS user will select Project Activity gantt view full page form "Line Schedule-Common"Then verify the Project Activity details when clicking on ViewEdit Full Information LinkThen validate DPS user will check editing permissions from the "Line Schedule-Common" gantt view full page formThen verify when projectUser clicks on BackThen validate DPS user will select FragnetStep gantt view full page form "Prepare & Issue Process Line Schedule"Then verify the Project Activity details when clicking on ViewEdit Full Information LinkThen validate DPS user will check editing permissions from the "Prepare & Issue Process Line Schedule" gantt view full page formThen verify when projectUser clicks on BackThen validate DPS user will select Gig gantt view full page form "Engineer Prepare"Then verify the Project Activity details when clicking on ViewEdit Full Information LinkThen validate DPS user will check editing permissions from the "Engineer Prepare" gantt view full page formThen verify when projectUser clicks on BackThen validate user click on complete buttonUSER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLYThen closing the browserFailValidate View/Approve Project Plan HeaderThen verify the Day Scale in Preliminary Discipline Plan "Day","Week","Month"Then verify user apply the filter by clicking on the filter icon "" Then validate DPS user will select Project Activity gantt view full page form "Tie-In List And Details-num1-cwa1-tie2"Then verify the Project Activity details when clicking on ViewEdit Full Information LinkStep skippedThen validate DPS user will check editing permissions from the "Tie-In List And Details-num1-cwa1-tie2" gantt view full page formStep skippedThen verify when projectUser clicks on BackStep skippedThen validate DPS user will select FragnetStep gantt view full page form "Update Piping Tie-In List / Prepare Location Drawings & Details"Step skippedThen verify the Project Activity details when clicking on ViewEdit Full Information LinkStep skippedThen validate DPS user will check editing permissions from the "Update Piping Tie-In List / Prepare Location Drawings & Details" gantt view full page formStep skippedThen verify when projectUser clicks on BackStep skippedThen validate DPS user will select Gig gantt view full page form "Review Tie-Ins On P&IDs"Step skippedThen verify the Project Activity details when clicking on ViewEdit Full Information LinkStep skippedThen validate DPS user will check editing permissions from the "Review Tie-Ins On P&IDs" gantt view full page formStep skippedThen verify when projectUser clicks on BackStep skippedThen validate user click on complete buttonStep skippedThen closing the browserStep skippedcom.wipro.qa.stepDefinitions.ProjectInformationStep.embedScreenshot(io.cucumber.java.Scenario)Failed ScreenShot Taken -
Project Information as a Process Role
10:36:43 AM / 00:00:00:000 Pass
Project Information as a Process Role
06.03.2021 10:36:43 06.03.2021 10:36:43 00:00:00:000 · #test-id=827@projectInformation -
Validating WBSInformation Header as a Process Role
10:38:25 AM / 00:01:53:075 Pass
Validating WBSInformation Header as a Process Role
06.03.2021 10:38:25 06.03.2021 10:40:18 00:01:53:075 · #test-id=848@wbsInformationPassValidate Philosophy Document List SectionPassValidate Philosophy Document List SectionThen validate viewing data that needs to be updated, I can click on addRow button to addOrupdate data and changes have been made on the screen the Save button enable "6666","Automation Philo"Then Validate user click on the save buttonUSER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLYThen validate user click on complete buttonUSER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLYWhen validate once complete button clicked then Reset, Save and Complete buttons will be replaced with an Edit button and validate Section is completedThen validate Section is completed, a check next to the "Philosophy Document List" label will display in left panelPassValidate Study List SectionPassValidate Study List SectionThen validate user click on "Study List"When validate viewing data that needs to be updated, i can click on addRow button to addOrupdate the data and change have been made on the screen the Save button enable "666","Automation study"Then Validate user click on the save buttonUSER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLYThen validate user click on complete buttonUSER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLYWhen The last section within the last header area with dependencies is being marked Complete, and it IS the LAST section of the LAST of two header areas to be marked complete, a popup will be displayed identifying the process that will be initiated if they continueThen validate Section is completed, a check next to the "Study List" label will display in left panelThen validate Top header is completed with cheked markThen closing the browser -
Validating ReferenceLibrary Header as a Process role
10:40:18 AM / 00:11:26:417 Fail
Validating ReferenceLibrary Header as a Process role
06.03.2021 10:40:18 06.03.2021 10:51:44 00:11:26:417 · #test-id=876FailValidate ProjectSpecificDocumentsprocess sectionsFailValidate ProjectSpecificDocumentsprocess sectionsWhen Validate user when moving the slider to on positionThen validate moving the slider to on position only editing of name "Automation" and ID, deletingorpasting of Link "https://www.google.com/" allowedThen Validate Hovering over link cell will display entire linkThen Validate user can save the updated data and link will become a hyperlink to open the file or websiteThen Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X iconWhen validate user click on AddReference buttonStep skippedThen validate Newly added row can be saved with categoryName and without ID or link "Automation Category"Step skippedThen Validate user click on the save buttonStep skippedThen validate user click on complete buttonStep skippedWhen validate Section is completed, a check next to the "Project-Specific Documents - Process" label will display in left panelStep skippedcom.wipro.qa.stepDefinitions.ProjectInformationStep.embedScreenshot(io.cucumber.java.Scenario)Failed ScreenShot TakenPassValidate clientDocumentsProcess sectionsPassValidate clientDocumentsProcess sectionsThen validate user click on "Client Documents - Process"When validate user click on AddReference buttonThen validate Newly added row can be saved with categoryName and without ID or link "Automation Category"Then validate moving the slider to on position only editing of name "Automation" and ID, deletingorpasting of Link "https://www.google.com/" allowedThen Validate user click on the save buttonUSER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLYThen validate user click on complete buttonUSER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLYWhen validate Section is completed, a check next to the "Client Documents - Process" label will display in left panelFailValidate ProceduresProcess sectionFailValidate ProceduresProcess sectionThen validate user click on "Procedures - Process"When Validate user when moving the slider to on positionThen validate moving the slider to on position only deletingorpasting of link allowed in ProcedureManagement "https://www.google.com/"Then Validate Hovering over link cell will display entire linkThen Validate user can save the updated data and link will become a hyperlink to open the file or websiteThen Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X iconWhen validate user click on AddReference buttonStep skippedThen validate Newly added row can be saved with name "Automation Name" only and without ID or linkStep skippedThen Validate user click on the save buttonStep skippedThen validate user click on complete buttonStep skippedWhen validate Section is completed, a check next to the "Procedures - Process" label will display in left panelStep skippedcom.wipro.qa.stepDefinitions.ProjectInformationStep.embedScreenshot(io.cucumber.java.Scenario)Failed ScreenShot TakenFailValidate calculationTemplatesProcess sectionsFailValidate calculationTemplatesProcess sectionsThen validate user click on "Calculation Templates - Process"When Validate user when moving the slider to on positionThen validate moving the slider to on position only deletingorpasting of link allowed in ProcedureManagement "https://www.google.com/"Then Validate Hovering over link cell will display entire linkThen Validate user can save the updated data and link will become a hyperlink to open the file or websiteThen Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X iconWhen validate user click on AddReference buttonStep skippedThen validate Newly added row can be saved with name "Automation" only and without ID or linkStep skippedThen Validate user click on the save buttonStep skippedThen validate moving the slider to on position only deletingorpasting of link allowed in ProcedureManagement "https://www.google.com/"Step skippedThen validate user click on complete buttonStep skippedWhen validate Section is completed, a check next to the "Calculation Templates - Process" label will display in left panelStep skippedcom.wipro.qa.stepDefinitions.ProjectInformationStep.embedScreenshot(io.cucumber.java.Scenario)Failed ScreenShot TakenPassValidate typicalDetailsProcess sectionsPassValidate typicalDetailsProcess sectionsThen validate user click on "Typical Details - Process"When validate user click on AddReference buttonThen validate Newly added row can be saved with name "Automation" only and without ID or linkThen Validate user click on the save buttonUSER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLYThen validate moving the slider to on position only deletingorpasting of link allowed in ProcedureManagement "https://www.google.com/"Then validate user click on complete buttonUSER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLYWhen validate Section is completed, a check next to the "Typical Details - Process" label will display in left panelFailValidate ManualsHandbooksProcess sectionsFailValidate ManualsHandbooksProcess sectionsThen validate user click on "Manuals/Handbooks - Process"When Validate user when moving the slider to on positionThen validate moving the slider to on position only deletingorpasting of link allowed in ProcedureManagement "https://www.google.com/"Then Validate Hovering over link cell will display entire linkThen Validate user can save the updated data and link will become a hyperlink to open the file or websiteThen Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X iconWhen validate user click on AddReference buttonStep skippedThen validate Newly added row can be saved with name "Automation Name" only and without ID or linkStep skippedThen Validate user click on the save buttonStep skippedThen validate user click on complete buttonStep skippedWhen validate Section is completed, a check next to the "Manuals/Handbooks - Process" label will display in left panelStep skippedcom.wipro.qa.stepDefinitions.ProjectInformationStep.embedScreenshot(io.cucumber.java.Scenario)Failed ScreenShot TakenFailValidate trainingProcess sectionsFailValidate trainingProcess sectionsThen validate user click on "Training - Process"When Validate user when moving the slider to on positionThen validate moving the slider to on position only deletingorpasting of link allowed in ProcedureManagement "https://www.google.com/"Then Validate Hovering over link cell will display entire linkThen Validate user can save the updated data and link will become a hyperlink to open the file or websiteThen Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X iconWhen validate user click on AddReference buttonStep skippedThen validate Newly added row can be saved with name "Automation Name" only and without ID or linkStep skippedThen Validate user click on the save buttonStep skippedThen validate user click on complete buttonStep skippedWhen validate Section is completed, a check next to the "Training - Process" label will display in left panelStep skippedcom.wipro.qa.stepDefinitions.ProjectInformationStep.embedScreenshot(io.cucumber.java.Scenario)Failed ScreenShot TakenFailValidate otherProcess sectionsFailValidate otherProcess sectionsThen validate user click on "Other - Process"When Validate user when moving the slider to on positionThen validate moving the slider to on position only deletingorpasting of link allowed in ProcedureManagement "https://www.google.com/"Then Validate Hovering over link cell will display entire linkThen Validate user can save the updated data and link will become a hyperlink to open the file or websiteThen Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X iconWhen validate user click on AddReference buttonStep skippedThen validate Newly added row can be saved with name "Automation Name" only and without ID or linkStep skippedThen Validate user click on the save buttonStep skippedThen validate user click on complete buttonStep skippedWhen validate Section is completed, a check next to the "Other - Process" label will display in left panelStep skippedcom.wipro.qa.stepDefinitions.ProjectInformationStep.embedScreenshot(io.cucumber.java.Scenario)Failed ScreenShot TakenFailValidate checklistsProcess sectionsFailValidate checklistsProcess sectionsThen validate user click on "Checklists - Process"When validate user click on AddReference buttonThen validate Newly added row can be saved with name "Automation" only and without ID or linkThen Validate user click on the save buttonUSER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLYThen validate moving the slider to on position only deletingorpasting of link allowed in ProcedureManagement "https://www.google.com/"Then validate user click on complete buttonUSER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLYWhen validate Section is completed, a check next to the "Checklists - Process" label will display in left panelThen validate Top ReferenceLibrary header is completed with cheked markThen closing the browserStep skippedcom.wipro.qa.stepDefinitions.ProjectInformationStep.embedScreenshot(io.cucumber.java.Scenario)Failed ScreenShot Taken -
Validating AssignTeam Header as a Process Role
10:51:44 AM / 00:06:32:711 Pass
Validating AssignTeam Header as a Process Role
06.03.2021 10:51:44 06.03.2021 10:58:17 00:06:32:711 · #test-id=1,008PassValidate ProcessTeamLeads Section: Select Roles and add professional name and NavigationPassValidate ProcessTeamLeads Section: Select Roles and add professional name and NavigationWhen validate "Process Team Leads" section is NOT completed, an empty circle next to the Section label will display in left panelWhen validate toggle is ON and the name field will enableWhen validate entering the assignee name, it will search for matching names and display NameJobFamilyOffice "Matthew Fowler / Lead / Kansas"Then Validate user click on the save buttonUSER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLYWhen validate upon making an edit, the Save button will be enabled and the Complete button will be disable "Pooja Chaurasiya / Project Engineer / Wipro"When validate System will prompt user to save record if user is moving away from sectionscreen to "Process Team" without saving dataWhen validate the section information has been saved and the Complete button will be enabledWhen validate toggling off a role with a name populated the name will clear and field will disableWhen validate For select roles, user can select +Add Professional which will create a new blank field to populate an additional professional for a given role "Matthew Fowler / Lead / Kansas","Pooja Chaurasiya / Project Engineer / Wipro"Then Validate user click on the save buttonUSER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLYWhen validate a section within a header area that does not have dependencies Project Information, Project Reference Library, Assign Project Lead has been marked complete, the Reset, Save and Complete buttons will be replaced with an Edit buttonWhen validate Section is completed, a check next to the "Process Team Leads" label will display in left panelThen Validate user click on the Edit buttonWhen validate clicking on Define User Permissions displays a list of user permissions so that I can assign an individual in Discipline "Matthew Fowler / Lead / Kansas"Then validate hovering over i icon next to user permissions provides additional informationORdescription of permissionsThen validate user can select Save to save the selectionsPassValidate ProcessTeam Section: Select Roles and add professional name and NavigationPassValidate ProcessTeam Section: Select Roles and add professional name and NavigationThen validate user click on "Process Team"When validate "Process Team" section is NOT completed, an empty circle next to the Section label will display in left panelWhen validate toggle is ON and the name field will enableWhen validate entering the assignee name, it will search for matching names and display NameJobFamilyOffice "Rohan Mendu / Project Engineer / Wipro"Then Validate user click on the save buttonUSER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLYWhen validate upon making an edit, the Save button will be enabled and the Complete button will be disable "Himani Bhatnagar / null / undefined"When validate System will prompt user to save record if user is moving away from sectionscreen to "Process Team Leads" without saving dataWhen validate the section information has been saved and the Complete button will be enabledWhen validate toggling off a role with a name populated the name will clear and field will disableWhen validate For select roles, user can select +Add Professional which will create a new blank field to populate an additional professional for a given role "Rohan Mendu / Project Engineer / Wipro","Himani Bhatnagar / null / undefined"Then Validate user click on the save buttonUSER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLYWhen validate a section within a header area that does not have dependencies Project Information, Project Reference Library, Assign Project Lead has been marked complete, the Reset, Save and Complete buttons will be replaced with an Edit buttonWhen validate Section is completed, a check next to the "Process Team" label will display in left panelThen Validate user click on the Edit buttonWhen validate clicking on Define User Permissions displays a list of user permissions so that I can assign an individual in Discipline "Rohan Mendu / Project Engineer / Wipro"Then validate hovering over i icon next to user permissions provides additional informationORdescription of permissionsThen validate user can select Save to save the selections -
Validating ProjectActivity Header as a Process Role
10:58:58 AM / 00:00:00:000 Pass
Validating ProjectActivity Header as a Process Role
06.03.2021 10:58:58 06.03.2021 10:58:58 00:00:00:000 · #test-id=1,065 -
Gig Workflows as a Process role
11:01:57 AM / 00:11:59:721 Pass
Gig Workflows as a Process role
06.03.2021 11:01:57 06.03.2021 11:13:56 00:11:59:721 · #test-id=1,094PassCompleted all the the five steps on Gig Worflow for Process disciplinePassCompleted all the the five steps on Gig Worflow for Process disciplineGiven validate user login as a "process@bv.com" roleUSER HAS LOGGED-IN SUCCESSFULLYThen validate user select newly created project cardPROJECT HAS BEEN SELECTED SUCCESSFULLYAnd user select giga workflow from top menuAnd user select the option gig workflow dropdown "Line Schedule"And user select activity informationActivity Activity Information And user click edit button to edit existing details.And user fill activity information formAnd user select Customize FragnetActivity Customize Fragnet And user click edit button and change fileds on customize fragnet pageAnd user click save continue buttonAnd user select FragnetStepInformation tabActivity FragnetStep Information And user click edit button and change fileds on FragnetStepInformationAnd user click save continue buttonAnd User selects Stepfour Customize GignetAnd user click edit button for editAnd user remove all selected customie gignetPrepare & Issue Process Line Schedule And user fill values and completed stepfour Customize Gignet and save continue allprocessPrepare & Issue Process Line Schedule And user select StepFive Gig InformationActivity Gignet Giginfo And user click edit button for editAnd user remove all selected GiginformationPrepare & Issue Process Line Schedule And user selects Selected values in Stepfive and complete slide menu on Gig informationPrepare & Issue Process Line Schedule Engineer Prepare,Engineer Review,Engineer Update And Sign,Engineer Review And Sign,Lead Engineer Review Fragnet For Completion And Sign -
Validating View/Approve Project Plan Header as a Process role
11:13:56 AM / 00:00:00:000 Pass
Validating View/Approve Project Plan Header as a Process role
06.03.2021 11:13:56 06.03.2021 11:13:56 00:00:00:000 · #test-id=1,120 -
Validating Project Information Header as a Piping Role
11:19:00 AM / 00:05:04:098 Pass
Validating Project Information Header as a Piping Role
06.03.2021 11:19:00 06.03.2021 11:24:04 00:05:04:098 · #test-id=1,146@projectInformationPassValidate LoginPassValidate LoginGiven validate user login as a "piping@bv.com" roleUSER HAS LOGGED-IN SUCCESSFULLYThen validate user select newly created project cardPROJECT HAS BEEN SELECTED SUCCESSFULLYThen validate "Project Information" header is clickedUSER HAS BEEN CLICKED ON HEADER SUCCESSFULLYPassValidate LoginGiven validate user login as a "piping@bv.com" roleUSER HAS LOGGED-IN SUCCESSFULLYThen validate user select newly created project cardPROJECT HAS BEEN SELECTED SUCCESSFULLYThen validate "WBS Information" header is clickedUSER HAS BEEN CLICKED ON HEADER SUCCESSFULLYPasschecking the buttons operationsPasschecking the buttons operationsWhen validate user updateORenter value in 2D Design Software Textbox "Automation Test" and then reset, save button is enableWhen Validate user click on ResetButtonThen Validate ResetPage modal is popUpThen validate Reset message is display under pop ModalThen validate click on cancel button modal is disapearThen validate again user click on reset buttonThen validate user click on continue buttonThen validate reset and save button is disable and complete button is enabledThen validate user updateORenter value in 2D Design Software Textbox "Automation Test" and then reset, save button is enableThen validate user click on save button then reset and save button is disable and complete button is enabledPassCheck when user save the blank add field formWhen validate addField button is Display and clickThen validate user click on the save buttonThen validate filed validation eror message is display -
Validating WBS Information Header Piping Role
11:23:06 AM / 00:02:28:598 Pass
Validating WBS Information Header Piping Role
06.03.2021 11:23:06 06.03.2021 11:25:35 00:02:28:598 · #test-id=1,203@WBSInformationDPSPassvalidate As a Piping discipline I will see sections: Pipe Specification ListPassvalidate As a Piping discipline I will see sections: Pipe Specification ListThen validate viewing data that needs to be updated, I can click on Pipe Specification List to addOrupdate the data and changes have been made on the screen by clicking on save "66666","Automation Piping","Test Class"Then Validate user click on the save buttonUSER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLYThen validate user click on complete buttonUSER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLYThen validate Section is completed, a check next to the "Pipe Specification List" label will display in left panelPassvalidate As a Piping discipline I will see sections: Tie-in Priority ListPassvalidate As a Piping discipline I will see sections: Tie-in Priority ListThen validate user click on "Tie-in Priority List"Then validate viewing data that needs to be updated, I can click on addROW button to addOrupdate the data and changes have been made on the screen the Save button enable "6666","664"Then Validate user click on the save buttonUSER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLYThen validate user click on complete buttonUSER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLYThen validate Section is completed, a check next to the "Tie-in Priority List" label will display in left panelPassValidate SystemFluid List SectionPassValidate SystemFluid List SectionThen validate user click on "System/Fluid List"When validate viewing data that needs to be updated, i can click on addROW button to addOrupdate the data and changes have been made on the screen the Save button enable "AutoFliud"Then Validate user click on the save buttonUSER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLYThen validate user click on complete buttonUSER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLYWhen The last section within the last header area with dependencies is being marked Complete, and it IS the LAST section of the LAST of two header areas to be marked complete, a popup will be displayed identifying the process that will be initiated if they continueThen validate Section is completed, a check next to the "System/Fluid List" label will display in left panelThen validate Top header is completed with cheked markThen closing the browser -
Validating Reference Library Header as a Piping role
11:25:35 AM / 00:12:11:006 Fail
Validating Reference Library Header as a Piping role
06.03.2021 11:25:35 06.03.2021 11:37:46 00:12:11:006 · #test-id=1,239PassValidate ProjectSpecificDocumentsPiping sectionsPassValidate ProjectSpecificDocumentsPiping sectionsWhen Validate user when moving the slider to on positionThen validate moving the slider to on position only editing of name "Automation" and ID, deletingorpasting of Link "https://www.google.com/" allowedThen Validate Hovering over link cell will display entire linkThen Validate user can save the updated data and link will become a hyperlink to open the file or websiteThen Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X iconWhen validate user click on AddReference buttonThen validate Newly added row can be saved with categoryName and without ID or link "Automation Category"Then Validate user click on the save buttonUSER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLYThen validate user click on complete buttonUSER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLYWhen validate Section is completed, a check next to the "Project-Specific Documents - Piping" label will display in left panelPassValidate ClientDocumentPiping sectionPassValidate ClientDocumentPiping sectionThen validate user click on "Client Documents - Piping"When validate user click on AddReference buttonThen validate Newly added row can be saved with categoryName and without ID or link "Automation Category"Then validate moving the slider to on position only editing of name "Automation" and ID, deletingorpasting of Link "https://www.google.com/" allowedThen Validate user click on the save buttonUSER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLYThen validate user click on complete buttonUSER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLYWhen validate Section is completed, a check next to the "Client Documents - Piping" label will display in left panelFailValidate ProceduresPiping sectionFailValidate ProceduresPiping sectionThen validate user click on "Procedures - Piping"When Validate user when moving the slider to on positionThen validate moving the slider to on position only deletingorpasting of link allowed in ProcedureManagement "https://www.google.com/"Then Validate Hovering over link cell will display entire linkThen Validate user can save the updated data and link will become a hyperlink to open the file or websiteThen Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X iconWhen validate user click on AddReference buttonStep skippedThen validate Newly added row can be saved with name "Automation Name" only and without ID or linkStep skippedThen Validate user click on the save buttonStep skippedThen validate user click on complete buttonStep skippedWhen validate Section is completed, a check next to the "Procedures - Piping" label will display in left panelStep skippedcom.wipro.qa.stepDefinitions.ProjectInformationStep.embedScreenshot(io.cucumber.java.Scenario)Failed ScreenShot TakenFailValidate calculationTemplatesPiping sectionsFailValidate calculationTemplatesPiping sectionsThen validate user click on "Calculation Templates - Piping"When Validate user when moving the slider to on positionThen validate moving the slider to on position only deletingorpasting of link allowed in ProcedureManagement "https://www.google.com/"Then Validate Hovering over link cell will display entire linkThen Validate user can save the updated data and link will become a hyperlink to open the file or websiteThen Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X iconWhen validate user click on AddReference buttonStep skippedThen validate Newly added row can be saved with name "Automation" only and without ID or linkStep skippedThen Validate user click on the save buttonStep skippedThen validate moving the slider to on position only deletingorpasting of link allowed in ProcedureManagement "https://www.google.com/"Step skippedThen validate user click on complete buttonStep skippedWhen validate Section is completed, a check next to the "Calculation Templates - Piping" label will display in left panelStep skippedcom.wipro.qa.stepDefinitions.ProjectInformationStep.embedScreenshot(io.cucumber.java.Scenario)Failed ScreenShot TakenFailValidate typicalDetailsPiping sectionsFailValidate typicalDetailsPiping sectionsThen validate user click on "Typical Details - Piping"When Validate user when moving the slider to on positionThen validate moving the slider to on position only deletingorpasting of link allowed in ProcedureManagement "https://www.google.com/"Then Validate Hovering over link cell will display entire linkThen Validate user can save the updated data and link will become a hyperlink to open the file or websiteThen Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X iconWhen validate user click on AddReference buttonStep skippedThen validate Newly added row can be saved with name "Automation" only and without ID or linkStep skippedThen Validate user click on the save buttonStep skippedThen validate moving the slider to on position only deletingorpasting of link allowed in ProcedureManagement "https://www.google.com/"Step skippedThen validate user click on complete buttonStep skippedWhen validate Section is completed, a check next to the "Typical Details - Piping" label will display in left panelStep skippedcom.wipro.qa.stepDefinitions.ProjectInformationStep.embedScreenshot(io.cucumber.java.Scenario)Failed ScreenShot TakenFailValidate ManualsHandbooksPiping sectionsFailValidate ManualsHandbooksPiping sectionsThen validate user click on "Manuals/Handbooks - Piping"When Validate user when moving the slider to on positionThen validate moving the slider to on position only deletingorpasting of link allowed in ProcedureManagement "https://www.google.com/"Then Validate Hovering over link cell will display entire linkThen Validate user can save the updated data and link will become a hyperlink to open the file or websiteThen Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X iconWhen validate user click on AddReference buttonStep skippedThen validate Newly added row can be saved with name "Automation Name" only and without ID or linkStep skippedThen Validate user click on the save buttonStep skippedThen validate user click on complete buttonStep skippedWhen validate Section is completed, a check next to the "Manuals/Handbooks - Piping" label will display in left panelStep skippedcom.wipro.qa.stepDefinitions.ProjectInformationStep.embedScreenshot(io.cucumber.java.Scenario)Failed ScreenShot TakenPassValidate trainingPiping sectionsPassValidate trainingPiping sectionsThen validate user click on "Training - Piping"When validate user click on AddReference buttonThen validate Newly added row can be saved with categoryName and without ID or link "Automation Category"Then validate moving the slider to on position only editing of name "Automation" and ID, deletingorpasting of Link "https://www.google.com/" allowedThen Validate user click on the save buttonUSER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLYThen validate user click on complete buttonUSER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLYWhen validate Section is completed, a check next to the "Training - Piping" label will display in left panelFailValidate otherPiping sectionsFailValidate otherPiping sectionsThen validate user click on "Other - Piping"When Validate user when moving the slider to on positionThen validate moving the slider to on position only deletingorpasting of link allowed in ProcedureManagement "https://www.google.com/"Then Validate Hovering over link cell will display entire linkThen Validate user can save the updated data and link will become a hyperlink to open the file or websiteThen Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X iconWhen validate user click on AddReference buttonStep skippedThen validate Newly added row can be saved with name "Automation Name" only and without ID or linkStep skippedThen Validate user click on the save buttonStep skippedThen validate user click on complete buttonStep skippedWhen validate Section is completed, a check next to the "Other - Piping" label will display in left panelStep skippedcom.wipro.qa.stepDefinitions.ProjectInformationStep.embedScreenshot(io.cucumber.java.Scenario)Failed ScreenShot TakenFailValidate checklistsPiping sectionsFailValidate checklistsPiping sectionsThen validate user click on "Checklists - Piping"When Validate user when moving the slider to on positionThen validate moving the slider to on position only deletingorpasting of link allowed in ProcedureManagement "https://www.google.com/"Then Validate Hovering over link cell will display entire linkThen Validate user can save the updated data and link will become a hyperlink to open the file or websiteThen Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X iconWhen validate user click on AddReference buttonStep skippedThen validate Newly added row can be saved with name "Automation" only and without ID or linkStep skippedThen Validate user click on the save buttonStep skippedThen validate user click on complete buttonStep skippedWhen validate Section is completed, a check next to the "Checklists - Piping" label will display in left panelStep skippedThen validate Top ReferenceLibrary header is completed with cheked markStep skippedThen closing the browserStep skippedcom.wipro.qa.stepDefinitions.ProjectInformationStep.embedScreenshot(io.cucumber.java.Scenario)Failed ScreenShot Taken -
Validating AssignTeam Header as a PipingRole
11:37:46 AM / 00:06:32:777 Pass
Validating AssignTeam Header as a PipingRole
06.03.2021 11:37:46 06.03.2021 11:44:19 00:06:32:777 · #test-id=1,376PassValidate PipingTeamLeads Section: Select Roles and add professional name and NavigationPassValidate PipingTeamLeads Section: Select Roles and add professional name and NavigationWhen validate "Piping Team Leads" section is NOT completed, an empty circle next to the Section label will display in left panelWhen validate toggle is ON and the name field will enableWhen validate entering the assignee name, it will search for matching names and display NameJobFamilyOffice "shilpa vepur / Project Engineer / Wipro"Then Validate user click on the save buttonUSER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLYWhen validate upon making an edit, the Save button will be enabled and the Complete button will be disable "nuthalapati sravanthi / Project Engineer / Wipro"When validate System will prompt user to save record if user is moving away from sectionscreen to "Piping Team" without saving dataWhen validate the section information has been saved and the Complete button will be enabledWhen validate toggling off a role with a name populated the name will clear and field will disableWhen validate For select roles, user can select +Add Professional which will create a new blank field to populate an additional professional for a given role "shilpa vepur / Project Engineer / Wipro","nuthalapati sravanthi / Project Engineer / Wipro"Then Validate user click on the save buttonUSER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLYWhen validate a section within a header area that does not have dependencies Project Information, Project Reference Library, Assign Project Lead has been marked complete, the Reset, Save and Complete buttons will be replaced with an Edit buttonWhen validate Section is completed, a check next to the "Piping Team Leads" label will display in left panelThen Validate user click on the Edit buttonWhen validate clicking on Define User Permissions displays a list of user permissions so that I can assign an individual in Discipline "shilpa vepur / Project Engineer / Wipro"Then validate hovering over i icon next to user permissions provides additional informationORdescription of permissionsThen validate user can select Save to save the selectionsPassValidate PipingTeam Section: Select Roles and add professional name and NavigationPassValidate PipingTeam Section: Select Roles and add professional name and NavigationThen validate user click on "Piping Team"When validate "Piping Team" section is NOT completed, an empty circle next to the Section label will display in left panelWhen validate toggle is ON and the name field will enableWhen validate entering the assignee name, it will search for matching names and display NameJobFamilyOffice "Kaushikee Bhawsar / null / undefined"Then Validate user click on the save buttonUSER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLYWhen validate upon making an edit, the Save button will be enabled and the Complete button will be disable "Nuthalapati Sravanthi / null / undefined"When validate System will prompt user to save record if user is moving away from sectionscreen to "Piping Team Leads" without saving dataWhen validate the section information has been saved and the Complete button will be enabledWhen validate toggling off a role with a name populated the name will clear and field will disableWhen validate For select roles, user can select +Add Professional which will create a new blank field to populate an additional professional for a given role "Kaushikee Bhawsar / null / undefined","Nuthalapati Sravanthi / null / undefined"Then Validate user click on the save buttonUSER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLYWhen validate a section within a header area that does not have dependencies Project Information, Project Reference Library, Assign Project Lead has been marked complete, the Reset, Save and Complete buttons will be replaced with an Edit buttonWhen validate Section is completed, a check next to the "Piping Team" label will display in left panelThen Validate user click on the Edit buttonWhen validate clicking on Define User Permissions displays a list of user permissions so that I can assign an individual in Discipline "Kaushikee Bhawsar / null / undefined"Then validate hovering over i icon next to user permissions provides additional informationORdescription of permissionsThen validate user can select Save to save the selections -
Validating Project Activity Header as a Piping Role
11:45:00 AM / 00:00:00:000 Pass
Validating Project Activity Header as a Piping Role
06.03.2021 11:45:00 06.03.2021 11:45:00 00:00:00:000 · #test-id=1,433 -
Gig Workflows as a Piping role
11:48:21 AM / 00:04:13:366 Fail
Gig Workflows as a Piping role
06.03.2021 11:48:21 06.03.2021 11:52:35 00:04:13:366 · #test-id=1,462FailCompleted all the the five steps on Gig Worflow for Piping disciplineFailCompleted all the the five steps on Gig Worflow for Piping disciplineGiven validate user login as a "piping@bv.com" roleUSER HAS LOGGED-IN SUCCESSFULLYThen validate user select newly created project cardPROJECT HAS BEEN SELECTED SUCCESSFULLYAnd user select giga workflow from top menuAnd user select the option gig workflow dropdown "Tie-In List And Details"And user select activity informationActivity Activity Information And user click edit button to edit existing details.And user fill activity information formAnd user select Customize FragnetActivity Customize Fragnet And user click edit button and change fileds on customize fragnet pageAnd user click save continue buttonAnd user select FragnetStepInformation tabActivity FragnetStep Information And user click edit button and change fileds on FragnetStepInformationAnd user click save continue buttonAnd User selects Stepfour Customize GignetAnd user click edit button for editAnd user remove all selected customie gignetUpdate Piping Tie-In List / Prepare Location Drawings & Details IHR Piping Tie-In List, Location Dwgs & Details Incorp IHR Comments And Issue Piping Tie-In List, Location Drawings, & Details For Client Review Client Review Piping Tie-In List, Location Drawings & Details Incorp Client Comments And Issue Piping Tie-In List, Location Drawings, & Details For 3rd Party Review And user fill values and completed stepfour Customize Gignet and save continue allprocessUpdate Piping Tie-In List / Prepare Location Drawings & Details IHR Piping Tie-In List, Location Dwgs & Details Incorp IHR Comments And Issue Piping Tie-In List, Location Drawings, & Details For Client Review Client Review Piping Tie-In List, Location Drawings & Details Incorp Client Comments And Issue Piping Tie-In List, Location Drawings, & Details For 3rd Party Review Step skippedAnd user select StepFive Gig InformationActivity Gignet Giginfo Step skippedAnd user click edit button for editStep skippedAnd user remove all selected GiginformationUpdate Piping Tie-In List / Prepare Location Drawings & Details IHR Piping Tie-In List, Location Dwgs & Details Incorp IHR Comments And Issue Piping Tie-In List, Location Drawings, & Details For Client Review Client Review Piping Tie-In List, Location Drawings & Details Incorp Client Comments And Issue Piping Tie-In List, Location Drawings, & Details For 3rd Party Review Step skippedAnd user selects Selected values in Stepfive and complete slide menu on Gig informationUpdate Piping Tie-In List / Prepare Location Drawings & Details Review Tie-Ins On P&IDs,Gather Info On Physical Tie-In Locations,Locate Tie-Ins In Model,Create Tie-In Spreadsheet,Create Tie-In Package,Create Tie-In Location Drawing,Issue Drawing For IHR IHR Piping Tie-In List, Location Dwgs & Details IHR Facilitator Compiles IHR Comments Incorp IHR Comments And Issue Piping Tie-In List, Location Drawings, & Details For Client Review Address IHR Comments,Issue For Client Review Client Review Piping Tie-In List, Location Drawings & Details Client Review Facilitator Compiles Comments Incorp Client Comments And Issue Piping Tie-In List, Location Drawings, & Details For 3rd Party Review Address Client Review Comments,Extract Info From Model / Clean Up And Annotate,Issue For 3rd Party Review 3rd Party Review Piping Tie-In List, Location Drawings, & Details 3rd Party Review Facilitator Compiles Comments Incorp 3rd Party Comments And IFC Piping Tie-In List, Location Drawings, & Details Address 3rd Party Review Comments,Extract Info From Model / Clean Up And Annotate,PDE Review Approve And Stamp,PLD Review And Issue Step skippedcom.wipro.qa.stepDefinitions.ProjectInformationStep.embedScreenshot(io.cucumber.java.Scenario)Failed ScreenShot Taken -
Validating ViewApprove Full Project Plan Header as a Piping Role
11:52:35 AM / 00:00:00:000 Pass
Validating ViewApprove Full Project Plan Header as a Piping Role
06.03.2021 11:52:35 06.03.2021 11:52:35 00:00:00:000 · #test-id=1,488
-
@WBSInformationDPS
5 tests
@WBSInformationDPS
5 passedStatus Timestamp TestName Pass 11:23:06 AM Validating WBS Information Header Piping Role Pass 11:23:06 AM Validate Login Validating Project Information Header as a Piping Role.Validate LoginPass 11:24:04 AM validate As a Piping discipline I will see sections: Pipe Specification List Validating WBS Information Header Piping Role.validate As a Piping discipline I will see sections: Pipe Specification ListPass 11:24:30 AM validate As a Piping discipline I will see sections: Tie-in Priority List Validating WBS Information Header Piping Role.validate As a Piping discipline I will see sections: Tie-in Priority ListPass 11:24:58 AM Validate SystemFluid List Section Validating WBS Information Header Piping Role.Validate SystemFluid List Section -
@wbsInformation
7 tests
@wbsInformation
7 passedStatus Timestamp TestName Pass 09:41:46 AM Validating WBS Information Header Equipment Role Pass 09:41:46 AM Validate login Reference Library as a PLI Role.Validate loginPass 09:42:46 AM Validate Mechenical Equipment List Validating WBS Information Header Equipment Role.Validate Mechenical Equipment ListPass 10:38:25 AM Validating WBSInformation Header as a Process Role Pass 10:38:25 AM Validate login Reference Library as a PLI Role.Validate loginPass 10:39:23 AM Validate Philosophy Document List Section Validating WBSInformation Header as a Process Role.Validate Philosophy Document List SectionPass 10:39:42 AM Validate Study List Section Validating WBSInformation Header as a Process Role.Validate Study List Section -
@projectInformation
31 tests
@projectInformation
31 passedStatus Timestamp TestName Pass 08:58:41 AM Validating New Project Creation as a SuperUser Role Pass 08:58:41 AM Validate New Project Creation Validating New Project Creation as a SuperUser Role.Validate New Project CreationPass 09:16:55 AM Validating Project Information Header as a PLI Role Pass 09:16:55 AM Validate login as PLI role Validating Project Information Header as a PLI Role.Validate login as PLI rolePass 09:17:54 AM Checking the Initial fuctionality GeneralProjectInformation SubSection Validating Project Information Header as a PLI Role.Checking the Initial fuctionality GeneralProjectInformation SubSectionPass 09:18:22 AM Checking the functionlity of Reset button under GeneralProjectInformation SubSection Validating Project Information Header as a PLI Role.Checking the functionlity of Reset button under GeneralProjectInformation SubSectionPass 09:19:01 AM Checking user can enter the value in textBox Or Fill the entire form under GeneralProjectInformation SubSection Validating Project Information Header as a PLI Role.Checking user can enter the value in textBox Or Fill the entire form under GeneralProjectInformation SubSectionPass 09:21:28 AM Validate when Moving from the page without saving a Information Validating Project Information Header as a PLI Role.Validate when Moving from the page without saving a InformationPass 09:21:38 AM Checking the functionlity of save button under GeneralProjectInformation SubSection Validating Project Information Header as a PLI Role.Checking the functionlity of save button under GeneralProjectInformation SubSectionPass 09:21:48 AM Checking the operation when user edit the form Validating Project Information Header as a PLI Role.Checking the operation when user edit the formPass 09:22:05 AM Checking the operation of CompleteButton Validating Project Information Header as a PLI Role.Checking the operation of CompleteButtonPass 09:22:26 AM Checking the functionality of Add additional Project Metadata Field Validating Project Information Header as a PLI Role.Checking the functionality of Add additional Project Metadata FieldPass 09:22:50 AM Check when user save the blank add field form Validating Project Information Header as a PLI Role.Check when user save the blank add field formPass 09:23:06 AM Check when user enter duplicate fieldName in Add Field Modal which is already used within ProjectInformation Validating Project Information Header as a PLI Role.Check when user enter duplicate fieldName in Add Field Modal which is already used within ProjectInformationPass 09:23:39 AM Checking validation on Newly added numeric field Validating Project Information Header as a PLI Role.Checking validation on Newly added numeric fieldPass 09:24:11 AM Checking all mendetory field of Project Scope section Validating Project Information Header as a PLI Role.Checking all mendetory field of Project Scope sectionPass 09:25:56 AM Checking all mendetory field of Technical Requirement section Validating Project Information Header as a PLI Role.Checking all mendetory field of Technical Requirement sectionPass 09:26:49 AM Checking all mendetory field of Project Control section Validating Project Information Header as a PLI Role.Checking all mendetory field of Project Control sectionPass 09:27:22 AM Checking all mendetory field of Procurement section Validating Project Information Header as a PLI Role.Checking all mendetory field of Procurement sectionPass 09:40:47 AM Project Information as a DPS Equipment Role Pass 09:40:47 AM Validate Equipment discipline Project Information as a DPS Equipment Role.Validate Equipment disciplinePass 10:36:43 AM Project Information as a Process Role Pass 10:36:43 AM Validate login Reference Library as a PLI Role.Validate loginPass 10:37:42 AM Validate Process Section Validating ManHourBudget as a PLI Role.Validate Process SectionPass 11:19:00 AM Validating Project Information Header as a Piping Role Pass 11:19:00 AM Validate Login Validating Project Information Header as a Piping Role.Validate LoginPass 11:19:58 AM checking the buttons operations Validating Project Information Header as a Piping Role.checking the buttons operationsPass 11:21:22 AM Checking the functionality of Add additional Project Metadata Field Validating Project Information Header as a PLI Role.Checking the functionality of Add additional Project Metadata FieldPass 11:21:46 AM Check when user save the blank add field form Validating Project Information Header as a Piping Role.Check when user save the blank add field formPass 11:22:03 AM Check when user enter duplicate fieldName in Add Field Modal which is already used within ProjectInformation Validating Project Information Header as a PLI Role.Check when user enter duplicate fieldName in Add Field Modal which is already used within ProjectInformationPass 11:22:35 AM Checking validation on Newly added numeric field Validating Project Information Header as a PLI Role.Checking validation on Newly added numeric field -
@WBSInformation
6 tests
@WBSInformation
6 passedStatus Timestamp TestName Pass 09:27:58 AM Validating WBS Information Header PLI Role Pass 09:27:58 AM Validate as a PLI role, user click on the WBSInformation Header Validating WBS Information Header PLI Role.Validate as a PLI role, user click on the WBSInformation HeaderPass 09:28:56 AM Validate CWAList SubSection - User are able to Add new Row Validating WBS Information Header PLI Role.Validate CWAList SubSection - User are able to Add new RowPass 09:29:22 AM Validate ModuleList SubSection - User are able to Add new Row Validating WBS Information Header PLI Role.Validate ModuleList SubSection - User are able to Add new RowPass 09:30:05 AM Validate PurchaseSpecificationList - user are able to Add new Row Validating WBS Information Header PLI Role.Validate PurchaseSpecificationList - user are able to Add new RowPass 09:30:42 AM Validate Process Area List Section - User are able to Add new Row Validating WBS Information Header PLI Role.Validate Process Area List Section - User are able to Add new Row -
@ReferenceLibrary
8 tests
@ReferenceLibrary
8 failedStatus Timestamp TestName Fail 09:34:59 AM Reference Library as a PLI Role Fail 09:34:59 AM Validate login Reference Library as a PLI Role.Validate loginFail 09:35:51 AM Validate Project-Specific Documents - Management sections Reference Library as a PLI Role.Validate Project-Specific Documents - Management sectionsFail 09:38:12 AM Validate ClientDocumentManagementSection sections Reference Library as a PLI Role.Validate ClientDocumentManagementSection sectionsFail 09:38:32 AM Validate ProcedureManagement section Reference Library as a PLI Role.Validate ProcedureManagement sectionFail 09:38:53 AM Validate manualsHandbooksManagement sections Reference Library as a PLI Role.Validate manualsHandbooksManagement sectionsFail 09:39:13 AM Validate OtherManagement sections Reference Library as a PLI Role.Validate OtherManagement sectionsFail 09:39:34 AM Validate checklistsManagement sections Reference Library as a PLI Role.Validate checklistsManagement sections -
@TestCase44745
6 tests
@TestCase44745
2 passed 4 failedStatus Timestamp TestName Fail 10:03:20 AM Completed all the the five steps on Gig Worflow Landing page Gig Workflows as a Equipment role.Completed all the the five steps on Gig Worflow Landing pageFail 10:03:20 AM Completed all the the five steps on Gig Worflow Landing page Gig Workflows as a Equipment role.Completed all the the five steps on Gig Worflow Landing pagePass 11:01:57 AM Completed all the the five steps on Gig Worflow for Process discipline Gig Workflows as a Process role.Completed all the the five steps on Gig Worflow for Process disciplinePass 11:01:57 AM Completed all the the five steps on Gig Worflow for Process discipline Gig Workflows as a Process role.Completed all the the five steps on Gig Worflow for Process disciplineFail 11:48:21 AM Completed all the the five steps on Gig Worflow for Piping discipline Gig Workflows as a Piping role.Completed all the the five steps on Gig Worflow for Piping disciplineFail 11:48:21 AM Completed all the the five steps on Gig Worflow for Piping discipline Gig Workflows as a Piping role.Completed all the the five steps on Gig Worflow for Piping discipline
-
org.openqa.selenium.NoSuchElementException
1 tests
org.openqa.selenium.NoSuchElementException
1 failedStatus Timestamp TestName Fail 09:35:30 AM Then validate "Reference Library" header is clicked Reference Library as a PLI Role.Validate login.Then validate "Reference Library" header is clickedFail 09:37:51 AM Then Validate Hovering over link cell will display entire link Reference Library as a PLI Role.Validate Project-Specific Documents - Management sections.Then Validate Hovering over link cell will display entire linkFail 09:38:12 AM Then validate user click on "Client Documents - Management" Reference Library as a PLI Role.Validate ClientDocumentManagementSection sections.Then validate user click on "Client Documents - Management"Fail 09:38:32 AM Then validate user click on "Procedures - Management" Reference Library as a PLI Role.Validate ProcedureManagement section.Then validate user click on "Procedures - Management"Fail 09:38:53 AM Then validate user click on "Manuals/Handbooks - Management" Reference Library as a PLI Role.Validate manualsHandbooksManagement sections.Then validate user click on "Manuals/Handbooks - Management"Fail 09:39:13 AM Then validate user click on "Other - Management" Reference Library as a PLI Role.Validate OtherManagement sections.Then validate user click on "Other - Management"Fail 09:39:34 AM Then validate user click on "Checklists - Management" Reference Library as a PLI Role.Validate checklistsManagement sections.Then validate user click on "Checklists - Management"Fail 09:40:26 AM Then validate "Workflow Rules" header is clicked WorkflowRule for PLI Role.Validate As a PLI Define Workflow Rules: View and update FragnetStep durations and Define Workflow Rules: Select Applicable FragnetStep Types.Then validate "Workflow Rules" header is clickedFail 09:45:05 AM Then Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X icon Reference Library as a Equipment role.Validate ProjectSpecificDocumentsEquipment sections.Then Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X iconFail 09:47:05 AM Then Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X icon Reference Library as a Equipment role.Validate ProceduresEquipment section.Then Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X iconFail 09:49:07 AM Then Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X icon Reference Library as a Equipment role.Validate typicalDetailsEquipment sections.Then Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X iconFail 10:11:08 AM And user selects Selected values in Stepfive and complete slide menu on Gig information Gig Workflows as a Equipment role.Completed all the the five steps on Gig Worflow Landing page.And user selects Selected values in Stepfive and complete slide menu on Gig informationFail 10:36:03 AM Then validate " " header is clicked Reference Library as a PLI Role.Validate login.Then validate "" header is clicked Fail 10:36:23 AM Then verify the Day Scale in Preliminary Discipline Plan "Day","Week","Month" Validating View/Approve Project Plan Header as a Equipment role.Validate View/Approve Project Plan Header.Then verify the Day Scale in Preliminary Discipline Plan "Day","Week","Month"Fail 10:41:48 AM Then Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X icon Validating ReferenceLibrary Header as a Process role.Validate ProjectSpecificDocumentsprocess sections.Then Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X iconFail 10:43:47 AM Then Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X icon Validating ReferenceLibrary Header as a Process role.Validate ProceduresProcess section.Then Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X iconFail 10:45:10 AM Then Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X icon Validating ReferenceLibrary Header as a Process role.Validate calculationTemplatesProcess sections.Then Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X iconFail 10:47:13 AM Then Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X icon Validating ReferenceLibrary Header as a Process role.Validate ManualsHandbooksProcess sections.Then Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X iconFail 10:48:35 AM Then Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X icon Validating ReferenceLibrary Header as a Process role.Validate trainingProcess sections.Then Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X iconFail 10:49:58 AM Then Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X icon Validating ReferenceLibrary Header as a Process role.Validate otherProcess sections.Then Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X iconFail 11:29:01 AM Then Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X icon Validating Reference Library Header as a Piping role.Validate ProceduresPiping section.Then Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X iconFail 11:30:24 AM Then Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X icon Validating Reference Library Header as a Piping role.Validate calculationTemplatesPiping sections.Then Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X iconFail 11:31:53 AM Then Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X icon Validating Reference Library Header as a Piping role.Validate typicalDetailsPiping sections.Then Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X iconFail 11:33:16 AM Then Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X icon Validating Reference Library Header as a Piping role.Validate ManualsHandbooksPiping sections.Then Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X iconFail 11:35:36 AM Then Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X icon Validating Reference Library Header as a Piping role.Validate otherPiping sections.Then Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X iconFail 11:36:59 AM Then Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X icon Validating Reference Library Header as a Piping role.Validate checklistsPiping sections.Then Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X iconFail 11:52:12 AM And user remove all selected customie gignet Gig Workflows as a Piping role.Completed all the the five steps on Gig Worflow for Piping discipline.And user remove all selected customie gignetFail 11:55:11 AM Then validate DPS user will select Project Activity gantt view full page form "Tie-In List And Details-num1-cwa1-tie2" Validating View/Approve Project Plan Header as a Equipment role.Validate View/Approve Project Plan Header.Then validate DPS user will select Project Activity gantt view full page form "Tie-In List And Details-num1-cwa1-tie2" -
java.lang.NullPointerException
1 tests
java.lang.NullPointerException
1 failedStatus Timestamp TestName Fail 09:52:38 AM Then validate Top ReferenceLibrary header is completed with cheked mark Reference Library as a Equipment role.Validate checklistsEquipment sections.Then validate Top ReferenceLibrary header is completed with cheked markFail 10:51:24 AM Then validate Top ReferenceLibrary header is completed with cheked mark Validating ReferenceLibrary Header as a Process role.Validate checklistsProcess sections.Then validate Top ReferenceLibrary header is completed with cheked mark