Started

Jun 3, 2021 08:58:40 AM

Ended

Jun 3, 2021 11:55:31 AM

Features Passed

20

Features Failed

8

Features
Scenarios
Steps

Timeline

Tags

NamePassedFailedSkippedOthersPassed %
@WBSInformationDPS 5 0 0 0 100%
@wbsInformation 7 0 0 0 100%
@projectInformation 31 0 0 0 100%
@WBSInformation 6 0 0 0 100%
@ReferenceLibrary 0 8 0 0 0%
@TestCase44745 2 4 0 0 33.333%

System/Environment

NameValue
version 10
os Windows
  • Validating New Project Creation as a SuperUser Role

    08:58:41 AM / 00:00:33:766 Pass

    Validating New Project Creation as a SuperUser Role
    06.03.2021 08:58:41 06.03.2021 08:59:15 00:00:33:766 · #test-id=1
    @projectInformation
    PassValidate New Project Creation
    Given validate user login as a "superuser@bv.com" role
    USER HAS LOGGED-IN SUCCESSFULLY
    Then closing the browser
  • Validating AssignTeam Header as a SuperUser Role

    08:59:15 AM / 00:17:40:087 Pass

    Validating AssignTeam Header as a SuperUser Role
    06.03.2021 08:59:15 06.03.2021 09:16:55 00:17:40:087 · #test-id=8
    PassValidate login as SuperUser role
    Given validate user login as a "superuser@bv.com" role
    USER HAS LOGGED-IN SUCCESSFULLY
    Then validate user select newly created project card
    PROJECT HAS BEEN SELECTED SUCCESSFULLY
    Then validate "Assign Team" header is clicked
    USER HAS BEEN CLICKED ON HEADER SUCCESSFULLY
    PassValidate PipingLead Section: Select Roles and add professional name and Navigation
    When validate "Piping Leads" section is NOT completed, an empty circle next to the Section label will display in left panel
    When validate toggle is ON and the name field will enable
    When validate entering the assignee name, it will search for matching names and display NameJobFamilyOffice "Piping Discipline / Lead / Kansas"
    Then Validate user click on the save button
    USER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLY
    When validate upon making an edit, the Save button will be enabled and the Complete button will be disable "Electrical Discipline / Lead / Kansas"
    When validate System will prompt user to save record if user is moving away from sectionscreen to "Electrical Leads" without saving data
    When validate the section information has been saved and the Complete button will be enabled
    When validate toggling off a role with a name populated the name will clear and field will disable
    Then Validate user click on the save button
    USER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLY
    When validate a section within a header area that does not have dependencies Project Information, Project Reference Library, Assign Project Lead has been marked complete, the Reset, Save and Complete buttons will be replaced with an Edit button
    When validate Section is completed, a check next to the "Piping Leads" label will display in left panel
    Then Validate user click on the Edit button
    When validate clicking on Define User Permissions displays a list of user permissions so that I can assign an individual in Discipline "Piping Discipline / Lead / Kansas"
    Then validate hovering over i icon next to user permissions provides additional informationORdescription of permissions
    Then validate user can select Save to save the selections
    PassValidate Electrical Leads Section: Select Roles and add professional name and Navigation
    Then validate user click on "Electrical Leads"
    When validate "Electrical Leads" section is NOT completed, an empty circle next to the Section label will display in left panel
    When validate toggle is ON and the name field will enable
    When validate entering the assignee name, it will search for matching names and display NameJobFamilyOffice "Electrical Discipline / Lead / Kansas"
    Then Validate user click on the save button
    USER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLY
    When validate upon making an edit, the Save button will be enabled and the Complete button will be disable "iandc Discipline / Lead / Kansas"
    When validate System will prompt user to save record if user is moving away from sectionscreen to "Piping Leads" without saving data
    When validate the section information has been saved and the Complete button will be enabled
    When validate toggling off a role with a name populated the name will clear and field will disable
    Then Validate user click on the save button
    USER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLY
    When validate a section within a header area that does not have dependencies Project Information, Project Reference Library, Assign Project Lead has been marked complete, the Reset, Save and Complete buttons will be replaced with an Edit button
    When validate Section is completed, a check next to the "Electrical Leads" label will display in left panel
    Then Validate user click on the Edit button
    When validate clicking on Define User Permissions displays a list of user permissions so that I can assign an individual in Discipline "Electrical Discipline / Lead / Kansas"
    Then validate hovering over i icon next to user permissions provides additional informationORdescription of permissions
    Then validate user can select Save to save the selections
    PassValidate I&C Leads Section: Select Roles and add professional name and Navigation
    Then validate user click on "I&C Leads"
    When validate "I&C Leads" section is NOT completed, an empty circle next to the Section label will display in left panel
    When validate toggle is ON and the name field will enable
    When validate entering the assignee name, it will search for matching names and display NameJobFamilyOffice "iandc Discipline / Lead / Kansas"
    Then Validate user click on the save button
    USER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLY
    When validate upon making an edit, the Save button will be enabled and the Complete button will be disable "Structural Discipline / Lead / Kansas"
    When validate System will prompt user to save record if user is moving away from sectionscreen to "Electrical Leads" without saving data
    When validate the section information has been saved and the Complete button will be enabled
    When validate toggling off a role with a name populated the name will clear and field will disable
    Then Validate user click on the save button
    USER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLY
    When validate a section within a header area that does not have dependencies Project Information, Project Reference Library, Assign Project Lead has been marked complete, the Reset, Save and Complete buttons will be replaced with an Edit button
    When validate Section is completed, a check next to the "I&C Leads" label will display in left panel
    Then Validate user click on the Edit button
    When validate clicking on Define User Permissions displays a list of user permissions so that I can assign an individual in Discipline "iandc Discipline / Lead / Kansas"
    Then validate hovering over i icon next to user permissions provides additional informationORdescription of permissions
    Then validate user can select Save to save the selections
    PassValidate Structural Leads Section: Select Roles and add professional name and Navigation
    Then validate user click on "Structural Leads"
    When validate "Structural Leads" section is NOT completed, an empty circle next to the Section label will display in left panel
    When validate toggle is ON and the name field will enable
    When validate entering the assignee name, it will search for matching names and display NameJobFamilyOffice "Structural Discipline / Lead / Kansas"
    Then Validate user click on the save button
    USER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLY
    When validate upon making an edit, the Save button will be enabled and the Complete button will be disable "Process Discipline / Lead / Kansas"
    When validate System will prompt user to save record if user is moving away from sectionscreen to "I&C Leads" without saving data
    When validate the section information has been saved and the Complete button will be enabled
    When validate toggling off a role with a name populated the name will clear and field will disable
    Then Validate user click on the save button
    USER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLY
    When validate a section within a header area that does not have dependencies Project Information, Project Reference Library, Assign Project Lead has been marked complete, the Reset, Save and Complete buttons will be replaced with an Edit button
    When validate Section is completed, a check next to the "Structural Leads" label will display in left panel
    Then Validate user click on the Edit button
    When validate clicking on Define User Permissions displays a list of user permissions so that I can assign an individual in Discipline "Structural Discipline / Lead / Kansas"
    Then validate hovering over i icon next to user permissions provides additional informationORdescription of permissions
    Then validate user can select Save to save the selections
    PassValidate Process Leads Section: Select Roles and add professional name and Navigation
    Then validate user click on "Process Leads"
    When validate "Process Leads" section is NOT completed, an empty circle next to the Section label will display in left panel
    When validate toggle is ON and the name field will enable
    When validate entering the assignee name, it will search for matching names and display NameJobFamilyOffice "Process Discipline / Lead / Kansas"
    Then Validate user click on the save button
    USER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLY
    When validate upon making an edit, the Save button will be enabled and the Complete button will be disable "Equipment Discipline / Lead / Kansas"
    When validate System will prompt user to save record if user is moving away from sectionscreen to "Structural Leads" without saving data
    When validate the section information has been saved and the Complete button will be enabled
    When validate toggling off a role with a name populated the name will clear and field will disable
    Then Validate user click on the save button
    USER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLY
    When validate a section within a header area that does not have dependencies Project Information, Project Reference Library, Assign Project Lead has been marked complete, the Reset, Save and Complete buttons will be replaced with an Edit button
    When validate Section is completed, a check next to the "Process Leads" label will display in left panel
    Then Validate user click on the Edit button
    When validate clicking on Define User Permissions displays a list of user permissions so that I can assign an individual in Discipline "Process Discipline / Lead / Kansas"
    Then validate hovering over i icon next to user permissions provides additional informationORdescription of permissions
    Then validate user can select Save to save the selections
    PassValidate Equipment Leads Section: Select Roles and add professional name and Navigation
    Then validate user click on "Equipment Leads"
    When validate "Equipment Leads" section is NOT completed, an empty circle next to the Section label will display in left panel
    When validate toggle is ON and the name field will enable
    When validate entering the assignee name, it will search for matching names and display NameJobFamilyOffice "Equipment Discipline / Lead / Kansas"
    Then Validate user click on the save button
    USER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLY
    When validate upon making an edit, the Save button will be enabled and the Complete button will be disable "Ramesh Rathod / Project Engineer / Wipro"
    When validate System will prompt user to save record if user is moving away from sectionscreen to "Process Leads" without saving data
    When validate the section information has been saved and the Complete button will be enabled
    When validate toggling off a role with a name populated the name will clear and field will disable
    Then Validate user click on the save button
    USER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLY
    When validate a section within a header area that does not have dependencies Project Information, Project Reference Library, Assign Project Lead has been marked complete, the Reset, Save and Complete buttons will be replaced with an Edit button
    When validate Section is completed, a check next to the "Equipment Leads" label will display in left panel
    Then Validate user click on the Edit button
    When validate clicking on Define User Permissions displays a list of user permissions so that I can assign an individual in Discipline "Equipment Discipline / Lead / Kansas"
    Then validate hovering over i icon next to user permissions provides additional informationORdescription of permissions
    Then validate user can select Save to save the selections
    PassValidate Management Team Section: Select Roles and add professional name and Navigation
    Then validate user click on "Management Team"
    When validate "Management Team" section is NOT completed, an empty circle next to the Section label will display in left panel
    When validate toggle is ON and the name field will enable
    When validate entering the assignee name, it will search for matching names and display NameJobFamilyOffice "Ramesh Rathod / Project Engineer / Wipro"
    Then Validate user click on the save button
    USER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLY
    When validate upon making an edit, the Save button will be enabled and the Complete button will be disable "Vepur S / Project Engineer / Wipro"
    When validate System will prompt user to save record if user is moving away from sectionscreen to "Equipment Leads" without saving data
    When validate the section information has been saved and the Complete button will be enabled
    When validate toggling off a role with a name populated the name will clear and field will disable
    Then Validate user click on the save button
    USER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLY
    When validate a section within a header area that does not have dependencies Project Information, Project Reference Library, Assign Project Lead has been marked complete, the Reset, Save and Complete buttons will be replaced with an Edit button
    When validate Section is completed, a check next to the "Management Team" label will display in left panel
    Then Validate user click on the Edit button
    When validate clicking on Define User Permissions displays a list of user permissions so that I can assign an individual in Discipline "Ramesh Rathod / Project Engineer / Wipro"
    Then validate hovering over i icon next to user permissions provides additional informationORdescription of permissions
    Then validate user can select Save to save the selections
  • Validating Project Information Header as a PLI Role

    09:16:55 AM / 02:06:11:112 Pass

    Validating Project Information Header as a PLI Role
    06.03.2021 09:16:55 06.03.2021 11:23:06 02:06:11:112 · #test-id=155
    @projectInformation
    PassValidate login as PLI role
    Given validate user login as a "RathodR@bv.com" role
    USER HAS LOGGED-IN SUCCESSFULLY
    Then validate user select newly created project card
    PROJECT HAS BEEN SELECTED SUCCESSFULLY
    Then validate "Project Information" header is clicked
    USER HAS BEEN CLICKED ON HEADER SUCCESSFULLY
    When User click on the GeneralProjectInformation SubSection First Time
    When Verify user can select value from the Project Type dropdown
    Then validate ResetBtn is Enable
    Then validate SaveBtn is Enable
    When Validate user click on ResetButton
    Then Validate ResetPage modal is popUp
    Then validate Reset message is display under pop Modal
    Then validate click on cancel button modal is disapear
    Then validate again user click on reset button
    Then validate user click on continue button
    PassChecking user can enter the value in textBox Or Fill the entire form under GeneralProjectInformation SubSection
    When Verify user can select value from the TypeOfFacility dropdown
    Then Verify user can select value from the SupportingOffices dropdown
    Then Verify user can select radio button in RiskAssessmentCompleted field
    Then Verify user can enter value in ProposalProjectRiskScore Textbox "244"
    Then Verify user can enter value in ProposalProjectRiskLevel Textbox "233"
    Then Verify user can select value from the LeadOffice dropdown
    Then Verify user can enter the value in FacilityTechnology textBox "233"
    Then Verify user can enter value in ClientName Textbox "Client Name Automation"
    Then Verify user can select radio button from BrownAndGreen field
    Then Verify user can select radio button from AreThereForiegnContract field
    Then Verify user can select radio button from IsBlackAndVeatch field
    Then Validate ProjectLocation Ttile is display
    Then Validate AddField IconText is display
    Then Verify user can enter value in ProjectLocationState Textbox "Maharastra"
    Then Verify user can enter value in ProjectLocationCountry Textbox "India"
    Then Verify user can enter value in ProjectLocationCity Textbox "Pune"
    Then Validate KeyScheduleDates Ttile is display
    Then Validate AddField IconText is display
    Then Verify user can enter value in EstEngineeringTimeframe Textbox "35"
    Then Verify user can enter value in EstConstructionTimeframe Textbox "40"
    When Validate user click on the projectScope Section
    When Validate user can Save the information by clicking on Save button
    Then validate CompleteBtn is Enable
    PassChecking the operation when user edit the form
    When Validate user enter the value in clientName field textbox "Client Name Testing"
    Then validate ResetBtn is Enable
    Then validate SaveBtn is Enable
    Then Validate user can Save the information by clicking on Save button
    When Validate user click on the complete button
    Then validate only Edit button is display
    Then Vaidate the section have check next to the Section
    Then Validate user click on the Edit button
    Then Validate check next to the Section is removed
    Then validate CompleteBttn is Enable
    PassChecking the functionality of Add additional Project Metadata Field
    When validate addField button is Display With BPD title
    Then validate user click on AddField button
    Then validate user enter value in fieldName textBox ""
    Then Validate user select value from the valueType dropDown
    Then Validate user click on the cancel button
    Then validate PROJECTSETUP_TOPTEXT screen display
    PassChecking the functionality of Add additional Project Metadata Field
    When validate addField button is Display and click
    Then validate user enter value in fieldName textBox "Testing"
    Then Validate user select value from the valueType dropDown
    Then Validate user click on the cancel button
    When validate user click on AddField icon
    Then validate user click on the save button
    Then validate filed validation eror message is display
    PassCheck when user enter duplicate fieldName in Add Field Modal which is already used within ProjectInformation
    When validate user enter duplicate field name "Project Location City"
    Then validate validation error message is display
    Then Validate user select Numeric value from dropdown
    Then validate UOMType and UOM option is display
    Then validate select value from the UOMType and UOM dropDown field
    Then Validate user enter fieldName "Testing Automation"
    Then Validate user click on the Save button
    Then validate added field is display under BasicProjectData section
    Then validate pencil icon for edit is display
    PassCheck when user enter duplicate fieldName in Add Field Modal which is already used within ProjectInformation
    When validate user enter duplicate field name "2D Design Software"
    Then validate validation error message is display
    Then Validate user select Numeric value from dropdown
    Then validate UOMType and UOM option is display
    Then validate select value from the UOMType and UOM dropDown field
    Then Validate user enter fieldName "Testing Automation"
    Then Validate user click on the Save button
    Then validate added field is display under BasicProjectData section
    Then validate pencil icon for edit is display
    PassChecking validation on Newly added numeric field
    When validate user enter alphabet in numeric field "Numeric Testing"
    Then Validate Validation error message is displays
    Then validate enter only numeric value "444"
    Then Validate user click on the save button
    USER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLY
    Then validate user click on complete button
    USER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLY
    When validate Section is completed, a check next to the "General Project Information" label will display in left panel
    PassChecking validation on Newly added numeric field
    When validate user enter alphabet in numeric field "Numeric Testing"
    Then Validate Validation error message is displays
    Then validate enter only numeric value "444"
    Then Validate user click on the save button
    USER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLY
    Then validate user click on complete button
    USER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLY
    Then validate Top ProjectInformation header is completed with cheked mark
    Then closing the browser
    PassChecking all mendetory field of Project Scope section
    When Validate user click on the ProjectScope Subsection
    Then validate user select and check all mendetory field in ProjectScope and click on save then complete "Automation Testing"
    Then Validate user click on the save button
    USER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLY
    Then validate user click on complete button
    USER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLY
    When validate Section is completed, a check next to the "Project Scope" label will display in left panel
    PassChecking all mendetory field of Technical Requirement section
    When Validate user click on the TechnicalRequirement section
    Then validate user select and check all mendetory field in TechnicalRequirement and click on save then complete "English Units","Test","6666"
    Then Validate user click on the save button
    USER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLY
    Then validate user click on complete button
    USER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLY
    When validate Section is completed, a check next to the "Technical Requirements" label will display in left panel
    PassChecking all mendetory field of Project Control section
    When Validate user click on the project control section
    Then validate user select and check all mendetory field in projectControl "Automation Testing"
    When validate addField button is Display and click
    Then Validate user click on the cancel button
    Then Validate user click on the save button
    USER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLY
    Then validate user click on complete button
    USER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLY
    When validate Section is completed, a check next to the "Project Controls" label will display in left panel
    PassChecking all mendetory field of Procurement section
    When Validate user click on the Procurement section
    Then validate user select and check all mendetory field in Procurement Software "Automation Testing"
    When validate addField button is Display and click
    Then Validate user click on the cancel button
    Then Validate user click on the save button
    USER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLY
    Then validate user click on complete button
    USER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLY
    When validate Section is completed, a check next to the "Procurement" label will display in left panel
    Then validate Top ProjectInformation header is completed with cheked mark
    Then closing the browser
  • Validating WBS Information Header PLI Role

    09:27:58 AM / 00:03:32:651 Pass

    Validating WBS Information Header PLI Role
    06.03.2021 09:27:58 06.03.2021 09:31:30 00:03:32:651 · #test-id=310
    @WBSInformation
    PassValidate as a PLI role, user click on the WBSInformation Header
    Given validate user login as a "RathodR@bv.com" role
    USER HAS LOGGED-IN SUCCESSFULLY
    Then validate user select newly created project card
    PROJECT HAS BEEN SELECTED SUCCESSFULLY
    Then validate "WBS Information" header is clicked
    USER HAS BEEN CLICKED ON HEADER SUCCESSFULLY
    PassValidate CWAList SubSection - User are able to Add new Row
    Then validate user click on add row button and user enter the CWA Number and CWA Name "1234","Test123"
    Then Validate save button is enabled
    Then Validate user click on the save button
    USER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLY
    Then validate complete button is enabled
    Then validate user click on complete button
    USER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLY
    Then validate Section is completed, a check next to the "CWA List" label will display in left panel
    PassValidate ModuleList SubSection - User are able to Add new Row
    Then validate user click on "Module List"
    Then validate user click on add row button and user enter the Modulenumber and modulename and CWA Numbername "1234M","ModuleTest","1234-Test123"
    Then Validate save button is enabled
    Then Validate user click on the save button
    USER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLY
    Then validate complete button is enabled
    Then validate user click on complete button
    USER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLY
    Then validate Section is completed, a check next to the "Module List" label will display in left panel
    PassValidate PurchaseSpecificationList - user are able to Add new Row
    Then validate user click on "Purchase Specification List"
    Then validate user click on addRow button and user enter the value in PurchaseSpecificationNumber and PurchaseSpecificationName and Discipline column "61"
    Then Validate save button is enabled
    Then Validate user click on the save button
    USER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLY
    Then validate complete button is enabled
    Then validate user click on complete button
    USER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLY
    Then validate Section is completed, a check next to the "Purchase Specification List" label will display in left panel
    PassValidate Process Area List Section - User are able to Add new Row
    Then validate user click on "Process Area List"
    Then validate user click on addRow button and user enter the value in Process Area ID and Process Area Name "123","processName"
    Then Validate user click on the save button
    USER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLY
    Then validate user click on complete button
    USER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLY
    When The last section within the last header area with dependencies is being marked Complete, and it IS the LAST section of the LAST of two header areas to be marked complete, a popup will be displayed identifying the process that will be initiated if they continue
    Then validate Section is completed, a check next to the "Process Area List" label will display in left panel
    Then validate Top header is completed with cheked mark
    Then closing the browser
  • Validating ManHourBudget as a PLI Role

    09:31:30 AM / 01:06:54:616 Pass

    Validating ManHourBudget as a PLI Role
    06.03.2021 09:31:30 06.03.2021 10:38:25 01:06:54:616 · #test-id=362
    PassValidate Piping Section
    Given validate user login as a "RathodR@bv.com" role
    USER HAS LOGGED-IN SUCCESSFULLY
    Then validate user select newly created project card
    PROJECT HAS BEEN SELECTED SUCCESSFULLY
    Then validate "Manhour Budget" header is clicked
    USER HAS BEEN CLICKED ON HEADER SUCCESSFULLY
    PassValidate Piping Section
    Then validate user fill the data in "Tie-In List And Details","25","","",""
    Then Validate user click on the save button
    USER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLY
    Then validate user click on complete button
    USER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLY
    When validate Section is completed, a check next to the "Piping" label will display in left panel
    PassValidate Electrical Section
    Then validate user click on "Electrical"
    Then validate user fill the data in "Electrical Load List excluding Voltage Drop Calculations","25","","",""
    Then Validate user click on the save button
    USER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLY
    Then validate user click on complete button
    USER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLY
    When validate Section is completed, a check next to the "Electrical" label will display in left panel
    PassValidate I&C Section
    Then validate user click on "I&C"
    Then validate user fill the data in "Instrument Index","25","","",""
    Then Validate user click on the save button
    USER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLY
    Then validate user click on complete button
    USER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLY
    When validate Section is completed, a check next to the "I&C" label will display in left panel
    PassValidate Structural Section
    Then validate user click on "Structural"
    Then validate user fill the data in "Piling Detail Drawings","25","","",""
    Then Validate user click on the save button
    USER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLY
    Then validate user click on complete button
    USER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLY
    When validate Section is completed, a check next to the "Structural" label will display in left panel
    PassValidate Process Section
    Then validate user click on "Process"
    Then validate user fill the data in "Line Schedule","25","","",""
    Then Validate user click on the save button
    USER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLY
    Then validate user click on complete button
    USER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLY
    When validate Section is completed, a check next to the "Process" label will display in left panel
    PassValidate Process Section
    When validate user updateORenter value in Design Review Facilitation Textbox "Test","TestAuto"
    When validate addField button is Display and click
    Then validate user enter value in fieldName textBox "Testing Automation"
    Then Validate user select value from the valueType dropDown
    Then Validate user click on the Save button
    When validate user enter alphabet in numeric field "Testing"
    Then Validate user click on the save button
    USER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLY
    Then validate user click on complete button
    USER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLY
    When validate Section is completed, a check next to the "Process" label will display in left panel
    Then validate Top ProjectInformation header is completed with cheked mark
    Then closing the browser
    PassValidate Equipment Section
    Then validate user click on "Equipment"
    Then validate user fill the data in "Mechanical Data Sheets","25","","",""
    Then Validate user click on the save button
    USER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLY
    Then validate user click on complete button
    USER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLY
    When The last section within the last header area with dependencies is being marked Complete, and it IS the LAST section of the LAST of two header areas to be marked complete, a popup will be displayed identifying the process that will be initiated if they continue
    When validate Section is completed, a check next to the "Equipment" label will display in left panel
    Then validate manHourBudget header is completed with cheked mark
    Then closing the browser
  • Reference Library as a PLI Role

    09:34:59 AM / 02:18:35:057 Fail

    Reference Library as a PLI Role
    06.03.2021 09:34:59 06.03.2021 11:53:34 02:18:35:057 · #test-id=425
    @ReferenceLibrary
    FailValidate login
    Given validate user login as a "RathodR@bv.com" role
    USER HAS LOGGED-IN SUCCESSFULLY
    Then validate "Reference Library" header is clicked
    com.wipro.qa.stepDefinitions.ProjectInformationStep.embedScreenshot(io.cucumber.java.Scenario)
    Failed ScreenShot Taken
    PassValidate login
    Given validate user login as a "equipment@bv.com" role
    USER HAS LOGGED-IN SUCCESSFULLY
    Then validate user select newly created project card
    PROJECT HAS BEEN SELECTED SUCCESSFULLY
    Then validate "WBS Information" header is clicked
    USER HAS BEEN CLICKED ON HEADER SUCCESSFULLY
    PassValidate login
    Given validate user login as a "equipment@bv.com" role
    USER HAS LOGGED-IN SUCCESSFULLY
    Then validate user select newly created project card
    PROJECT HAS BEEN SELECTED SUCCESSFULLY
    Then validate "Reference Library" header is clicked
    USER HAS BEEN CLICKED ON HEADER SUCCESSFULLY
    PassValidate login
    Given validate user login as a "equipment@bv.com" role
    USER HAS LOGGED-IN SUCCESSFULLY
    Then validate user select newly created project card
    PROJECT HAS BEEN SELECTED SUCCESSFULLY
    Then validate "Assign Team" header is clicked
    USER HAS BEEN CLICKED ON HEADER SUCCESSFULLY
    PassValidate login
    Given validate user login as a "equipment@bv.com" role
    USER HAS LOGGED-IN SUCCESSFULLY
    Then validate user select newly created project card
    PROJECT HAS BEEN SELECTED SUCCESSFULLY
    Then validate "Project Activities" header is clicked
    USER HAS BEEN CLICKED ON HEADER SUCCESSFULLY
    FailValidate login
    Given validate user login as a "equipment@bv.com" role
    USER HAS LOGGED-IN SUCCESSFULLY
    Then validate user select newly created project card
    PROJECT HAS BEEN SELECTED SUCCESSFULLY
    Then validate "" header is clicked
    com.wipro.qa.stepDefinitions.ProjectInformationStep.embedScreenshot(io.cucumber.java.Scenario)
    Failed ScreenShot Taken
    PassValidate login
    Given validate user login as a "process@bv.com" role
    USER HAS LOGGED-IN SUCCESSFULLY
    Then validate user select newly created project card
    PROJECT HAS BEEN SELECTED SUCCESSFULLY
    Then validate "Project Information" header is clicked
    USER HAS BEEN CLICKED ON HEADER SUCCESSFULLY
    PassValidate login
    Given validate user login as a "process@bv.com" role
    USER HAS LOGGED-IN SUCCESSFULLY
    Then validate user select newly created project card
    PROJECT HAS BEEN SELECTED SUCCESSFULLY
    Then validate "WBS Information" header is clicked
    USER HAS BEEN CLICKED ON HEADER SUCCESSFULLY
    PassValidate login
    Given validate user login as a "process@bv.com" role
    USER HAS LOGGED-IN SUCCESSFULLY
    Then validate user select newly created project card
    PROJECT HAS BEEN SELECTED SUCCESSFULLY
    Then validate "Reference Library" header is clicked
    USER HAS BEEN CLICKED ON HEADER SUCCESSFULLY
    PassValidate login
    Given validate user login as a "process@bv.com" role
    USER HAS LOGGED-IN SUCCESSFULLY
    Then validate user select newly created project card
    PROJECT HAS BEEN SELECTED SUCCESSFULLY
    Then validate "Assign Team" header is clicked
    USER HAS BEEN CLICKED ON HEADER SUCCESSFULLY
    PassValidate login
    Given validate user login as a "process@bv.com" role
    USER HAS LOGGED-IN SUCCESSFULLY
    Then validate user select newly created project card
    PROJECT HAS BEEN SELECTED SUCCESSFULLY
    Then validate "Project Activities" header is clicked
    USER HAS BEEN CLICKED ON HEADER SUCCESSFULLY
    PassValidate login
    Given validate user login as a "process@bv.com" role
    USER HAS LOGGED-IN SUCCESSFULLY
    Then validate user select newly created project card
    PROJECT HAS BEEN SELECTED SUCCESSFULLY
    Then validate "View/Approve Project Plan" header is clicked
    USER HAS BEEN CLICKED ON HEADER SUCCESSFULLY
    PassValidate login
    Given validate user login as a "piping@bv.com" role
    USER HAS LOGGED-IN SUCCESSFULLY
    Then validate user select newly created project card
    PROJECT HAS BEEN SELECTED SUCCESSFULLY
    Then validate "Reference Library" header is clicked
    USER HAS BEEN CLICKED ON HEADER SUCCESSFULLY
    PassValidate login
    Given validate user login as a "piping@bv.com" role
    USER HAS LOGGED-IN SUCCESSFULLY
    Then validate user select newly created project card
    PROJECT HAS BEEN SELECTED SUCCESSFULLY
    Then validate "Assign Team" header is clicked
    USER HAS BEEN CLICKED ON HEADER SUCCESSFULLY
    PassValidate login
    Given validate user login as a "piping@bv.com" role
    USER HAS LOGGED-IN SUCCESSFULLY
    Then validate user select newly created project card
    PROJECT HAS BEEN SELECTED SUCCESSFULLY
    Then validate "Project Activities" header is clicked
    USER HAS BEEN CLICKED ON HEADER SUCCESSFULLY
    PassValidate login
    Given validate user login as a "piping@bv.com" role
    USER HAS LOGGED-IN SUCCESSFULLY
    Then validate user select newly created project card
    PROJECT HAS BEEN SELECTED SUCCESSFULLY
    Then validate "View/Approve Project Plan" header is clicked
    USER HAS BEEN CLICKED ON HEADER SUCCESSFULLY
    FailValidate Project-Specific Documents - Management sections
    When Validate user when moving the slider to on position
    Then validate moving the slider to on position only editing of name "Automation" and ID, deletingorpasting of Link "https://www.google.com/" allowed
    Then Validate Hovering over link cell will display entire link
    Then Validate user can save the updated data and link will become a hyperlink to open the file or website
    Step skipped
    Then Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X icon
    Step skipped
    When validate user click on AddReference button
    Step skipped
    Then validate Newly added row can be saved with categoryName and without ID or link "Automation Category"
    Step skipped
    Then Validate user click on the save button
    Step skipped
    Then validate user click on complete button
    Step skipped
    When validate Section is completed, a check next to the "Project-Specific Documents - Management" label will display in left panel
    Step skipped
    com.wipro.qa.stepDefinitions.ProjectInformationStep.embedScreenshot(io.cucumber.java.Scenario)
    Failed ScreenShot Taken
    FailValidate ClientDocumentManagementSection sections
    Then validate user click on "Client Documents - Management"
    When validate user click on AddReference button
    Step skipped
    Then validate Newly added row can be saved with categoryName and without ID or link "Automation Category"
    Step skipped
    Then validate moving the slider to on position only editing of name "Automation" and ID, deletingorpasting of Link "https://www.google.com/" allowed
    Step skipped
    Then Validate user click on the save button
    Step skipped
    Then validate user click on complete button
    Step skipped
    When validate Section is completed, a check next to the "Client Documents - Management" label will display in left panel
    Step skipped
    com.wipro.qa.stepDefinitions.ProjectInformationStep.embedScreenshot(io.cucumber.java.Scenario)
    Failed ScreenShot Taken
    FailValidate ProcedureManagement section
    Then validate user click on "Procedures - Management"
    When Validate user when moving the slider to on position
    Step skipped
    Then validate moving the slider to on position only deletingorpasting of link allowed in ProcedureManagement "https://www.google.com/"
    Step skipped
    Then Validate Hovering over link cell will display entire link
    Step skipped
    Then Validate user can save the updated data and link will become a hyperlink to open the file or website
    Step skipped
    Then Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X icon
    Step skipped
    When validate user click on AddReference button
    Step skipped
    Then validate Newly added row can be saved with name "Automation Name" only and without ID or link
    Step skipped
    Then Validate user click on the save button
    Step skipped
    Then validate user click on complete button
    Step skipped
    When validate Section is completed, a check next to the "Procedures - Management" label will display in left panel
    Step skipped
    com.wipro.qa.stepDefinitions.ProjectInformationStep.embedScreenshot(io.cucumber.java.Scenario)
    Failed ScreenShot Taken
    FailValidate manualsHandbooksManagement sections
    Then validate user click on "Manuals/Handbooks - Management"
    When Validate user when moving the slider to on position
    Step skipped
    Then validate moving the slider to on position only deletingorpasting of link allowed in ProcedureManagement "https://www.google.com/"
    Step skipped
    Then Validate Hovering over link cell will display entire link
    Step skipped
    Then Validate user can save the updated data and link will become a hyperlink to open the file or website
    Step skipped
    Then Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X icon
    Step skipped
    When validate user click on AddReference button
    Step skipped
    Then validate Newly added row can be saved with name "Automation Name" only and without ID or link
    Step skipped
    Then Validate user click on the save button
    Step skipped
    Then validate user click on complete button
    Step skipped
    When validate Section is completed, a check next to the "Manuals/Handbooks - Management" label will display in left panel
    Step skipped
    com.wipro.qa.stepDefinitions.ProjectInformationStep.embedScreenshot(io.cucumber.java.Scenario)
    Failed ScreenShot Taken
    FailValidate OtherManagement sections
    Then validate user click on "Other - Management"
    When Validate user when moving the slider to on position
    Step skipped
    Then validate moving the slider to on position only deletingorpasting of link allowed in ProcedureManagement "https://www.google.com/"
    Step skipped
    Then Validate Hovering over link cell will display entire link
    Step skipped
    Then Validate user can save the updated data and link will become a hyperlink to open the file or website
    Step skipped
    Then Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X icon
    Step skipped
    When validate user click on AddReference button
    Step skipped
    Then validate Newly added row can be saved with name "Automation Name" only and without ID or link
    Step skipped
    Then Validate user click on the save button
    Step skipped
    Then validate user click on complete button
    Step skipped
    When validate Section is completed, a check next to the "Other - Management" label will display in left panel
    Step skipped
    com.wipro.qa.stepDefinitions.ProjectInformationStep.embedScreenshot(io.cucumber.java.Scenario)
    Failed ScreenShot Taken
    FailValidate checklistsManagement sections
    Then validate user click on "Checklists - Management"
    When Validate user when moving the slider to on position
    Step skipped
    Then Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X icon
    Step skipped
    Then validate moving the slider to on position only deletingorpasting of link allowed in ProcedureManagement "https://www.google.com/"
    Step skipped
    Then Validate Hovering over link cell will display entire link
    Step skipped
    Then Validate user can save the updated data and link will become a hyperlink to open the file or website
    Step skipped
    When validate user click on AddReference button
    Step skipped
    Then validate Newly added row can be saved with name "Automation Name" only and without ID or link
    Step skipped
    Then Validate user click on the save button
    Step skipped
    Then validate user click on complete button
    Step skipped
    When validate Section is completed, a check next to the "Checklists - Management" label will display in left panel
    Step skipped
    Then validate Top ReferenceLibrary header is completed with cheked mark
    Step skipped
    Then closing the browser
    Step skipped
    com.wipro.qa.stepDefinitions.ProjectInformationStep.embedScreenshot(io.cucumber.java.Scenario)
    Failed ScreenShot Taken
  • WorkflowRule for PLI Role

    09:39:54 AM / 00:00:52:031 Fail

    WorkflowRule for PLI Role
    06.03.2021 09:39:54 06.03.2021 09:40:47 00:00:52:031 · #test-id=519
    FailValidate As a PLI Define Workflow Rules: View and update FragnetStep durations and Define Workflow Rules: Select Applicable FragnetStep Types
    Given validate user login as a "RathodR@bv.com" role
    USER HAS LOGGED-IN SUCCESSFULLY
    Then validate "Workflow Rules" header is clicked
    Then validate If the box is unselected, upon hovering over a box, a select button appears
    Step skipped
    Then validate Upon selecting FragnetStep boxes, I can view the default durations tied to each step
    Step skipped
    Then validate when a duration needs to be changed, I can edit the durations by selecting the duration field
    Step skipped
    Then validate PLI is displayed a generic workflow with Create, and Issue for Construction static; In-House Review, Client Review, Combined IHR & Client Review, and 3rd-Party Review are selectable
    Step skipped
    Then validate If In-House Review or Client Review is selected, Combined IHR & Client Review CANNOT be selected and vice versa
    Step skipped
    Then validate If the box is selected, upon hovering over a box, a deselect button appears
    Step skipped
    Then validate Deselecting box removed check from upper left corner.
    Step skipped
    Then Validate user click on the save button
    Step skipped
    Then validate user click on complete button
    Step skipped
    When The last section within the last header area with dependencies is being marked Complete, and it IS the LAST section of the LAST of two header areas to be marked complete, a popup will be displayed identifying the process that will be initiated if they continue
    Step skipped
    Then validate Top defineWorkFlow header is completed with cheked mark
    Step skipped
    Then closing the browser
    Step skipped
    com.wipro.qa.stepDefinitions.ProjectInformationStep.embedScreenshot(io.cucumber.java.Scenario)
    Failed ScreenShot Taken
  • Project Information as a DPS Equipment Role

    09:40:47 AM / 00:00:59:290 Pass

    Project Information as a DPS Equipment Role
    06.03.2021 09:40:47 06.03.2021 09:41:46 00:00:59:290 · #test-id=538
    @projectInformation
    PassValidate Equipment discipline
    Given validate user login as a "equipment@bv.com" role
    USER HAS LOGGED-IN SUCCESSFULLY
    Then validate user select newly created project card
    PROJECT HAS BEEN SELECTED SUCCESSFULLY
    Then validate "Project Information" header is clicked
    USER HAS BEEN CLICKED ON HEADER SUCCESSFULLY
    Then closing the browser
  • Validating WBS Information Header Equipment Role

    09:41:46 AM / 00:01:44:484 Pass

    Validating WBS Information Header Equipment Role
    06.03.2021 09:41:46 06.03.2021 09:43:30 00:01:44:484 · #test-id=547
    @wbsInformation
    PassValidate Mechenical Equipment List
    Then validate viewing data that needs to be updated, I can click on addRow button to addORupdate the data and changes have been made on the screen the Save button enable "AutoTag","Autoequipment","Pump","61-Civil/Structural Equipment and Materials","123","123"
    Then Validate user click on the save button
    USER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLY
    Then validate user click on complete button
    USER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLY
    When The last section within the last header area with dependencies is being marked Complete, and it IS the LAST section of the LAST of two header areas to be marked complete, a popup will be displayed identifying the process that will be initiated if they continue
    Then validate Section is completed, a check next to the "Mechanical Equipment List" label will display in left panel
    Then validate Top header is completed with cheked mark
    Then closing the browser
  • Reference Library as a Equipment role

    09:43:30 AM / 00:09:27:577 Fail

    Reference Library as a Equipment role
    06.03.2021 09:43:30 06.03.2021 09:52:58 00:09:27:577 · #test-id=565
    FailValidate ProjectSpecificDocumentsEquipment sections
    When Validate user when moving the slider to on position
    Then validate moving the slider to on position only editing of name "Automation" and ID, deletingorpasting of Link "https://www.google.com/" allowed
    Then Validate Hovering over link cell will display entire link
    Then Validate user can save the updated data and link will become a hyperlink to open the file or website
    Then Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X icon
    When validate user click on AddReference button
    Step skipped
    Then validate Newly added row can be saved with categoryName and without ID or link "Automation Category"
    Step skipped
    Then Validate user click on the save button
    Step skipped
    Then validate user click on complete button
    Step skipped
    When validate Section is completed, a check next to the "Project-Specific Documents - Equipment" label will display in left panel
    Step skipped
    com.wipro.qa.stepDefinitions.ProjectInformationStep.embedScreenshot(io.cucumber.java.Scenario)
    Failed ScreenShot Taken
    PassValidate ClientDocumentEquipmentSection sections
    Then validate user click on "Client Documents - Equipment"
    When validate user click on AddReference button
    Then validate Newly added row can be saved with categoryName and without ID or link "Automation Category"
    Then validate moving the slider to on position only editing of name "Automation" and ID, deletingorpasting of Link "https://www.google.com/" allowed
    Then Validate user click on the save button
    USER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLY
    Then validate user click on complete button
    USER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLY
    When validate Section is completed, a check next to the "Client Documents - Equipment" label will display in left panel
    FailValidate ProceduresEquipment section
    Then validate user click on "Procedures - Equipment"
    When Validate user when moving the slider to on position
    Then validate moving the slider to on position only deletingorpasting of link allowed in ProcedureManagement "https://www.google.com/"
    Then Validate Hovering over link cell will display entire link
    Then Validate user can save the updated data and link will become a hyperlink to open the file or website
    Then Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X icon
    When validate user click on AddReference button
    Step skipped
    Then validate Newly added row can be saved with name "Automation Name" only and without ID or link
    Step skipped
    Then Validate user click on the save button
    Step skipped
    Then validate user click on complete button
    Step skipped
    When validate Section is completed, a check next to the "Procedures - Equipment" label will display in left panel
    Step skipped
    com.wipro.qa.stepDefinitions.ProjectInformationStep.embedScreenshot(io.cucumber.java.Scenario)
    Failed ScreenShot Taken
    PassValidate calculationTemplatesEquipment sections
    Then validate user click on "Calculation Templates - Equipment"
    When validate user click on AddReference button
    Then validate Newly added row can be saved with name "Automation" only and without ID or link
    Then Validate user click on the save button
    USER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLY
    Then validate moving the slider to on position only deletingorpasting of link allowed in ProcedureManagement "https://www.google.com/"
    Then validate user click on complete button
    USER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLY
    When validate Section is completed, a check next to the "Calculation Templates - Equipment" label will display in left panel
    FailValidate typicalDetailsEquipment sections
    Then validate user click on "Typical Details - Equipment"
    When Validate user when moving the slider to on position
    Then validate moving the slider to on position only deletingorpasting of link allowed in ProcedureManagement "https://www.google.com/"
    Then Validate Hovering over link cell will display entire link
    Then Validate user can save the updated data and link will become a hyperlink to open the file or website
    Then Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X icon
    When validate user click on AddReference button
    Step skipped
    Then validate Newly added row can be saved with name "Automation Name" only and without ID or link
    Step skipped
    Then Validate user click on the save button
    Step skipped
    Then validate user click on complete button
    Step skipped
    When validate Section is completed, a check next to the "Typical Details - Equipment" label will display in left panel
    Step skipped
    com.wipro.qa.stepDefinitions.ProjectInformationStep.embedScreenshot(io.cucumber.java.Scenario)
    Failed ScreenShot Taken
    PassValidate ManualsHandbooksEquipment sections
    Then validate user click on "Manuals/Handbooks - Equipment"
    When Validate user when moving the slider to on position
    Then validate moving the slider to on position only deletingorpasting of link allowed in ProcedureManagement "https://www.google.com/"
    Then Validate Hovering over link cell will display entire link
    Then Validate user can save the updated data and link will become a hyperlink to open the file or website
    Then Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X icon
    When validate user click on AddReference button
    Then validate Newly added row can be saved with name "Automation Name" only and without ID or link
    Then Validate user click on the save button
    USER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLY
    Then validate user click on complete button
    USER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLY
    When validate Section is completed, a check next to the "Manuals/Handbooks - Equipment" label will display in left panel
    PassValidate trainingEquipment sections
    Then validate user click on "Training - Equipment"
    When validate user click on AddReference button
    Then validate Newly added row can be saved with name "Automation" only and without ID or link
    Then Validate user click on the save button
    USER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLY
    Then validate user click on complete button
    USER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLY
    When validate Section is completed, a check next to the "Training - Equipment" label will display in left panel
    PassValidate otherEquipment sections
    Then validate user click on "Other - Equipment"
    When validate user click on AddReference button
    Then validate Newly added row can be saved with name "Automation" only and without ID or link
    Then Validate user click on the save button
    USER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLY
    Then validate user click on complete button
    USER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLY
    When validate Section is completed, a check next to the "Other - Equipment" label will display in left panel
    FailValidate checklistsEquipment sections
    Then validate user click on "Checklists - Equipment"
    When validate user click on AddReference button
    Then validate Newly added row can be saved with name "Automation" only and without ID or link
    Then Validate user click on the save button
    USER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLY
    Then validate user click on complete button
    USER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLY
    When validate Section is completed, a check next to the "Checklists - Equipment" label will display in left panel
    Then validate Top ReferenceLibrary header is completed with cheked mark
    Then closing the browser
    Step skipped
    com.wipro.qa.stepDefinitions.ProjectInformationStep.embedScreenshot(io.cucumber.java.Scenario)
    Failed ScreenShot Taken
  • Validating AssignTeam Header as a EquipmentRole

    09:52:58 AM / 01:52:01:475 Pass

    Validating AssignTeam Header as a EquipmentRole
    06.03.2021 09:52:58 06.03.2021 11:45:00 01:52:01:475 · #test-id=685
    PassValidate EquipmentTeamLeads Section: Select Roles and add professional name and Navigation
    When validate "Equipment Team Leads" section is NOT completed, an empty circle next to the Section label will display in left panel
    When validate toggle is ON and the name field will enable
    When validate entering the assignee name, it will search for matching names and display NameJobFamilyOffice "john doe / Lead / Wipro"
    Then Validate user click on the save button
    USER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLY
    When validate upon making an edit, the Save button will be enabled and the Complete button will be disable "Ramesh Chander / null / undefined"
    When validate System will prompt user to save record if user is moving away from sectionscreen to "Equipment Team" without saving data
    When validate the section information has been saved and the Complete button will be enabled
    When validate toggling off a role with a name populated the name will clear and field will disable
    When validate For select roles, user can select +Add Professional which will create a new blank field to populate an additional professional for a given role "john doe / Lead / Wipro","Ramesh Chander / null / undefined"
    Then Validate user click on the save button
    USER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLY
    When validate a section within a header area that does not have dependencies Project Information, Project Reference Library, Assign Project Lead has been marked complete, the Reset, Save and Complete buttons will be replaced with an Edit button
    When validate Section is completed, a check next to the "Equipment Team Leads" label will display in left panel
    Then Validate user click on the Edit button
    When validate clicking on Define User Permissions displays a list of user permissions so that I can assign an individual in Discipline "john doe / Lead / Wipro"
    Then validate hovering over i icon next to user permissions provides additional informationORdescription of permissions
    Then validate user can select Save to save the selections
    PassValidate EquipmentTeam Section: Select Roles and add professional name and Navigation
    Then validate user click on "Equipment Team"
    When validate "Equipment Team" section is NOT completed, an empty circle next to the Section label will display in left panel
    When validate toggle is ON and the name field will enable
    When validate entering the assignee name, it will search for matching names and display NameJobFamilyOffice "namita gauri / Technical Lead / Wipro"
    Then Validate user click on the save button
    USER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLY
    When validate upon making an edit, the Save button will be enabled and the Complete button will be disable "kaushikee bhawsar / Project Engineer / Wipro"
    When validate System will prompt user to save record if user is moving away from sectionscreen to "Equipment Team Leads" without saving data
    When validate the section information has been saved and the Complete button will be enabled
    When validate toggling off a role with a name populated the name will clear and field will disable
    When validate For select roles, user can select +Add Professional which will create a new blank field to populate an additional professional for a given role "namita gauri / Technical Lead / Wipro","kaushikee bhawsar / Project Engineer / Wipro"
    Then Validate user click on the save button
    USER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLY
    When validate a section within a header area that does not have dependencies Project Information, Project Reference Library, Assign Project Lead has been marked complete, the Reset, Save and Complete buttons will be replaced with an Edit button
    When validate Section is completed, a check next to the "Equipment Team" label will display in left panel
    Then Validate user click on the Edit button
    When validate clicking on Define User Permissions displays a list of user permissions so that I can assign an individual in Discipline "namita gauri / Technical Lead / Wipro"
    Then validate hovering over i icon next to user permissions provides additional informationORdescription of permissions
    Then validate user can select Save to save the selections
    PassValidate Add Project Role
    Then validate user click on "Equipment Team Leads"
    Then valiate user click on the Edit button
    When verify that user is able add new role and view added Role "Automation Role","Testing Automation..."
    Then Validate user click on the save button
    USER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLY
    Then validate user click on complete button
    USER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLY
    Then closing the browser
    PassValidate Add Project Role
    Then validate user click on "Process Team Leads"
    Then valiate user click on the Edit button
    When verify that user is able add new role and view added Role "Automation Role","Testing Automation..."
    Then Validate user click on the save button
    USER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLY
    Then validate user click on complete button
    USER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLY
    Then closing the browser
    PassValidate Add Project Role
    Then validate user click on "Piping Team Leads"
    Then valiate user click on the Edit button
    When verify that user is able add new role and view added Role "Automation Role","Testing Automation..."
    Then Validate user click on the save button
    USER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLY
    Then validate user click on complete button
    USER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLY
    Then closing the browser
  • Validating Project Activity Header as a Equipment Role

    10:00:11 AM / 01:48:10:259 Pass

    Validating Project Activity Header as a Equipment Role
    06.03.2021 10:00:11 06.03.2021 11:48:21 01:48:10:259 · #test-id=743
    PassValidate Define Activities
    Then Verify when user clicks on Generate Project Activities
    Then After including required activities and DPS clicks on Save button
    Then validate DPS can Add a Project Activity to DOS Activity section by selecting a plus Add Row button at the bottom of the table and by saving the activity, New row should be added below all the Activities "6655-4433"
    Then Verify DPS is able to edit the Activity name in the Activities list "3322edit"
    Then Verify when DPS selects multiple values from dropdown in WBS related fields in process
    Then Verify DPS is able to delete an Activity from Activity list
    Then Validate user click on the save button
    USER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLY
    Then To verify All DOS activities complete for process
    Then validate user click on complete button
    USER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLY
    PassValidate Define Activities
    Then Verify when user clicks on Generate Project Activities
    Then After including required activities and DPS clicks on Save button
    Then validate DPS can Add a Project Activity to DOS Activity section by selecting a plus Add Row button at the bottom of the table and by saving the activity, New row should be added below all the Activities "6655-4433"
    Then Verify DPS is able to edit the Activity name in the Activities list "3322edit"
    Then Verify DPS is able to delete an Activity from Activity list
    Then Validate user click on the save button
    USER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLY
    Then To verify Mark DOS activity complete for process
    Then validate edit Project Activity after DOS activity marked complete and again complete the DOS activity
    Then validate user click on complete button
    USER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLY
    PassValidate Define Activities
    Then Verify when user clicks on Generate Project Activities
    Then After including required activities and DPS clicks on Save button
    Then validate DPS can Add a Project Activity to DOS Activity section by selecting a plus Add Row button at the bottom of the table and by saving the activity, New row should be added below all the Activities "6655-4433"
    Then Verify DPS is able to edit the Activity name in the Activities list "3322edit"
    Then Verify when DPS selects multiple values from dropdown in WBS related fields
    Then Verify DPS is able to delete an Activity from Activity list
    Then To verify Mark DOS activity complete
    Then validate edit Project Activity after DOS activity marked complete and again complete the DOS activity
    Then validate user click on complete button
    USER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLY
    PassValidate ManHour Budget
    When validate user clicks on ManHour Budgets section
    Then validate field validation by passing the decimal value into field "10.5"
    Then validate user fill the equal data into each field of DOS Activity and then check the total of hours "25","","",""
    Then Validate user click on the save button
    USER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLY
    Then To verify Mark DOS activity complete
    Then validate user click on complete button
    USER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLY
    Then closing the browser
    PassValidate ManHour Budget
    When validate user clicks on ManHour Budgets section
    Then validate field validation by passing the decimal value into field "10.5"
    Then validate user fill the equal data into each field of DOS Activity and then check the total of hours "25","","",""
    Then Validate user click on the save button
    USER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLY
    Then To verify Mark DOS activity complete
    Then validate user click on complete button
    USER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLY
    Then closing the browser
    PassValidate ManHour Budget
    When validate user clicks on ManHour Budgets section
    Then validate field validation by passing the decimal value into field "10.5"
    Then validate user fill the equal data into each field of DOS Activity and then check the total of hours "25","","",""
    Then Validate user click on the save button
    USER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLY
    Then To verify Mark DOS activity complete
    Then validate user click on complete button
    USER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLY
    Then closing the browser
  • Gig Workflows as a Equipment role

    10:03:20 AM / 00:32:00:203 Fail

    Gig Workflows as a Equipment role
    06.03.2021 10:03:20 06.03.2021 10:35:20 00:32:00:203 · #test-id=774
    FailCompleted all the the five steps on Gig Worflow Landing page
    Given validate user login as a "equipment@bv.com" role
    USER HAS LOGGED-IN SUCCESSFULLY
    Then validate user select newly created project card
    PROJECT HAS BEEN SELECTED SUCCESSFULLY
    And user select giga workflow from top menu
    And user select the option gig workflow dropdown
    And user select activity information
    Activity
    Activity Information
    And user click edit button to edit existing details.
    And user fill activity information form
    And user select Customize Fragnet
    Activity
    Customize Fragnet
    And user click edit button and change fileds on customize fragnet page
    And user click save continue button
    And user select FragnetStepInformation tab
    Activity
    FragnetStep Information
    And user click edit button and change fileds on FragnetStepInformation
    And user click save continue button
    And User selects Stepfour Customize Gignet
    And user click edit button for edit
    And user remove all selected customie gignet
    Prepare & Issue Mech Equip Data Sheets Rev 0
    Update & Issue Mech Equip Data Sheets Rev 1
    Update & Issue Mech Equip Data Sheets Rev 2
    And user fill values and completed stepfour Customize Gignet and save continue allprocess
    Prepare & Issue Mech Equip Data Sheets Rev 0
    Update & Issue Mech Equip Data Sheets Rev 1
    Update & Issue Mech Equip Data Sheets Rev 2
    And user select StepFive Gig Information
    Activity Gignet Giginfo
    And user click edit button for edit
    And user remove all selected Giginformation
    Prepare & Issue Mech Equip Data Sheets Rev 0
    Update & Issue Mech Equip Data Sheets Rev 1
    Update & Issue Mech Equip Data Sheets Rev 2
    And user selects Selected values in Stepfive and complete slide menu on Gig information
    Prepare & Issue Mech Equip Data Sheets Rev 0Review Process Datasheets,Prepare Draft Mechanical Datasheets,Check Draft Mechanical Datasheets,Setup IHR Session For Mechanical Datasheets,Conduct IHR For Mechanical DatasheetsSPACE,Resolve IHR Comments For Mechanical DatasheetsSPACE,Pe Stamp Datasheets,Issue Of PE Stamped DatasheetsSPACE,Heat Exchanger 2D CAD Sketches
    Update & Issue Mech Equip Data Sheets Rev 1Review Process Datasheets,Tanks 2D CAD Sketches,Vessels 2D CAD Sketches,Heat Exchanger 2D CAD Sketches,3D Modeling And Asme Code Calculations,HTRI Modeling And Code Calculations,Prepare Draft Mechanical Datasheets,Check Draft Mechanical Datasheets,Setup IHR Session For Mechanical Datasheets,Conduct IHR For Mechanical DatasheetsSPACE,Resolve IHR Comments For Mechanical DatasheetsSPACE,Pe Stamp Datasheets,Issue Of PE Stamped DatasheetsSPACE
    Update & Issue Mech Equip Data Sheets Rev 2Review Process Datasheets,Tanks 2D CAD Sketches,Vessels 2D CAD Sketches,Heat Exchanger 2D CAD Sketches,3D Modeling And Asme Code Calculations,HTRI Modeling And Code Calculations,Prepare Draft Mechanical Datasheets,Check Draft Mechanical Datasheets,Setup IHR Session For Mechanical Datasheets,Conduct IHR For Mechanical DatasheetsSPACE,Resolve IHR Comments For Mechanical DatasheetsSPACE,Pe Stamp Datasheets,Issue Of PE Stamped DatasheetsSPACE
    com.wipro.qa.stepDefinitions.ProjectInformationStep.embedScreenshot(io.cucumber.java.Scenario)
    Failed ScreenShot Taken
  • Validating View/Approve Project Plan Header as a Equipment role

    10:35:21 AM / 01:20:10:561 Fail

    Validating View/Approve Project Plan Header as a Equipment role
    06.03.2021 10:35:21 06.03.2021 11:55:31 01:20:10:561 · #test-id=800
    FailValidate View/Approve Project Plan Header
    Then verify the Day Scale in Preliminary Discipline Plan "Day","Week","Month"
    Then verify user apply the filter by clicking on the filter icon ""
    Step skipped
    Then validate DPS user will select Project Activity gantt view full page form "Mechanical Data Sheets-61-Civil/Structural Equipment and Materials-Pump-AutoTag-Autoequipment"
    Step skipped
    Then verify the Project Activity details when clicking on ViewEdit Full Information Link
    Step skipped
    Then validate DPS user will check editing permissions from the "Mechanical Data Sheets-61-Civil/Structural Equipment and Materials-Pump-AutoTag-Autoequipment" gantt view full page form
    Step skipped
    Then verify when projectUser clicks on Back
    Step skipped
    Then validate DPS user will select FragnetStep gantt view full page form "Prepare & Issue Mech Equip Data Sheets Rev 0"
    Step skipped
    Then verify the Project Activity details when clicking on ViewEdit Full Information Link
    Step skipped
    Then validate DPS user will check editing permissions from the "Prepare & Issue Mech Equip Data Sheets Rev 0" gantt view full page form
    Step skipped
    Then verify when projectUser clicks on Back
    Step skipped
    Then validate DPS user will select Gig gantt view full page form "Review Process Datasheets"
    Step skipped
    Then verify the Project Activity details when clicking on ViewEdit Full Information Link
    Step skipped
    Then validate DPS user will check editing permissions from the "Review Process Datasheets" gantt view full page form
    Step skipped
    Then verify when projectUser clicks on Back
    Step skipped
    Then validate user click on complete button
    Step skipped
    Then closing the browser
    Step skipped
    com.wipro.qa.stepDefinitions.ProjectInformationStep.embedScreenshot(io.cucumber.java.Scenario)
    Failed ScreenShot Taken
    PassValidate View/Approve Project Plan Header
    Then verify the Day Scale in Preliminary Discipline Plan "Day","Week","Month"
    Then verify user apply the filter by clicking on the filter icon ""
    Then validate DPS user will select Project Activity gantt view full page form "Line Schedule-Common"
    Then verify the Project Activity details when clicking on ViewEdit Full Information Link
    Then validate DPS user will check editing permissions from the "Line Schedule-Common" gantt view full page form
    Then verify when projectUser clicks on Back
    Then validate DPS user will select FragnetStep gantt view full page form "Prepare & Issue Process Line Schedule"
    Then verify the Project Activity details when clicking on ViewEdit Full Information Link
    Then validate DPS user will check editing permissions from the "Prepare & Issue Process Line Schedule" gantt view full page form
    Then verify when projectUser clicks on Back
    Then validate DPS user will select Gig gantt view full page form "Engineer Prepare"
    Then verify the Project Activity details when clicking on ViewEdit Full Information Link
    Then validate DPS user will check editing permissions from the "Engineer Prepare" gantt view full page form
    Then verify when projectUser clicks on Back
    Then validate user click on complete button
    USER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLY
    Then closing the browser
    FailValidate View/Approve Project Plan Header
    Then verify the Day Scale in Preliminary Discipline Plan "Day","Week","Month"
    Then verify user apply the filter by clicking on the filter icon ""
    Then validate DPS user will select Project Activity gantt view full page form "Tie-In List And Details-num1-cwa1-tie2"
    Then verify the Project Activity details when clicking on ViewEdit Full Information Link
    Step skipped
    Then validate DPS user will check editing permissions from the "Tie-In List And Details-num1-cwa1-tie2" gantt view full page form
    Step skipped
    Then verify when projectUser clicks on Back
    Step skipped
    Then validate DPS user will select FragnetStep gantt view full page form "Update Piping Tie-In List / Prepare Location Drawings & Details"
    Step skipped
    Then verify the Project Activity details when clicking on ViewEdit Full Information Link
    Step skipped
    Then validate DPS user will check editing permissions from the "Update Piping Tie-In List / Prepare Location Drawings & Details" gantt view full page form
    Step skipped
    Then verify when projectUser clicks on Back
    Step skipped
    Then validate DPS user will select Gig gantt view full page form "Review Tie-Ins On P&IDs"
    Step skipped
    Then verify the Project Activity details when clicking on ViewEdit Full Information Link
    Step skipped
    Then validate DPS user will check editing permissions from the "Review Tie-Ins On P&IDs" gantt view full page form
    Step skipped
    Then verify when projectUser clicks on Back
    Step skipped
    Then validate user click on complete button
    Step skipped
    Then closing the browser
    Step skipped
    com.wipro.qa.stepDefinitions.ProjectInformationStep.embedScreenshot(io.cucumber.java.Scenario)
    Failed ScreenShot Taken
  • Project Information as a Process Role

    10:36:43 AM / 00:00:00:000 Pass

    Project Information as a Process Role
    06.03.2021 10:36:43 06.03.2021 10:36:43 00:00:00:000 · #test-id=827
    @projectInformation
  • Validating WBSInformation Header as a Process Role

    10:38:25 AM / 00:01:53:075 Pass

    Validating WBSInformation Header as a Process Role
    06.03.2021 10:38:25 06.03.2021 10:40:18 00:01:53:075 · #test-id=848
    @wbsInformation
    PassValidate Philosophy Document List Section
    Then validate viewing data that needs to be updated, I can click on addRow button to addOrupdate data and changes have been made on the screen the Save button enable "6666","Automation Philo"
    Then Validate user click on the save button
    USER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLY
    Then validate user click on complete button
    USER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLY
    When validate once complete button clicked then Reset, Save and Complete buttons will be replaced with an Edit button and validate Section is completed
    Then validate Section is completed, a check next to the "Philosophy Document List" label will display in left panel
    PassValidate Study List Section
    Then validate user click on "Study List"
    When validate viewing data that needs to be updated, i can click on addRow button to addOrupdate the data and change have been made on the screen the Save button enable "666","Automation study"
    Then Validate user click on the save button
    USER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLY
    Then validate user click on complete button
    USER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLY
    When The last section within the last header area with dependencies is being marked Complete, and it IS the LAST section of the LAST of two header areas to be marked complete, a popup will be displayed identifying the process that will be initiated if they continue
    Then validate Section is completed, a check next to the "Study List" label will display in left panel
    Then validate Top header is completed with cheked mark
    Then closing the browser
  • Validating ReferenceLibrary Header as a Process role

    10:40:18 AM / 00:11:26:417 Fail

    Validating ReferenceLibrary Header as a Process role
    06.03.2021 10:40:18 06.03.2021 10:51:44 00:11:26:417 · #test-id=876
    FailValidate ProjectSpecificDocumentsprocess sections
    When Validate user when moving the slider to on position
    Then validate moving the slider to on position only editing of name "Automation" and ID, deletingorpasting of Link "https://www.google.com/" allowed
    Then Validate Hovering over link cell will display entire link
    Then Validate user can save the updated data and link will become a hyperlink to open the file or website
    Then Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X icon
    When validate user click on AddReference button
    Step skipped
    Then validate Newly added row can be saved with categoryName and without ID or link "Automation Category"
    Step skipped
    Then Validate user click on the save button
    Step skipped
    Then validate user click on complete button
    Step skipped
    When validate Section is completed, a check next to the "Project-Specific Documents - Process" label will display in left panel
    Step skipped
    com.wipro.qa.stepDefinitions.ProjectInformationStep.embedScreenshot(io.cucumber.java.Scenario)
    Failed ScreenShot Taken
    PassValidate clientDocumentsProcess sections
    Then validate user click on "Client Documents - Process"
    When validate user click on AddReference button
    Then validate Newly added row can be saved with categoryName and without ID or link "Automation Category"
    Then validate moving the slider to on position only editing of name "Automation" and ID, deletingorpasting of Link "https://www.google.com/" allowed
    Then Validate user click on the save button
    USER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLY
    Then validate user click on complete button
    USER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLY
    When validate Section is completed, a check next to the "Client Documents - Process" label will display in left panel
    FailValidate ProceduresProcess section
    Then validate user click on "Procedures - Process"
    When Validate user when moving the slider to on position
    Then validate moving the slider to on position only deletingorpasting of link allowed in ProcedureManagement "https://www.google.com/"
    Then Validate Hovering over link cell will display entire link
    Then Validate user can save the updated data and link will become a hyperlink to open the file or website
    Then Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X icon
    When validate user click on AddReference button
    Step skipped
    Then validate Newly added row can be saved with name "Automation Name" only and without ID or link
    Step skipped
    Then Validate user click on the save button
    Step skipped
    Then validate user click on complete button
    Step skipped
    When validate Section is completed, a check next to the "Procedures - Process" label will display in left panel
    Step skipped
    com.wipro.qa.stepDefinitions.ProjectInformationStep.embedScreenshot(io.cucumber.java.Scenario)
    Failed ScreenShot Taken
    FailValidate calculationTemplatesProcess sections
    Then validate user click on "Calculation Templates - Process"
    When Validate user when moving the slider to on position
    Then validate moving the slider to on position only deletingorpasting of link allowed in ProcedureManagement "https://www.google.com/"
    Then Validate Hovering over link cell will display entire link
    Then Validate user can save the updated data and link will become a hyperlink to open the file or website
    Then Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X icon
    When validate user click on AddReference button
    Step skipped
    Then validate Newly added row can be saved with name "Automation" only and without ID or link
    Step skipped
    Then Validate user click on the save button
    Step skipped
    Then validate moving the slider to on position only deletingorpasting of link allowed in ProcedureManagement "https://www.google.com/"
    Step skipped
    Then validate user click on complete button
    Step skipped
    When validate Section is completed, a check next to the "Calculation Templates - Process" label will display in left panel
    Step skipped
    com.wipro.qa.stepDefinitions.ProjectInformationStep.embedScreenshot(io.cucumber.java.Scenario)
    Failed ScreenShot Taken
    PassValidate typicalDetailsProcess sections
    Then validate user click on "Typical Details - Process"
    When validate user click on AddReference button
    Then validate Newly added row can be saved with name "Automation" only and without ID or link
    Then Validate user click on the save button
    USER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLY
    Then validate moving the slider to on position only deletingorpasting of link allowed in ProcedureManagement "https://www.google.com/"
    Then validate user click on complete button
    USER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLY
    When validate Section is completed, a check next to the "Typical Details - Process" label will display in left panel
    FailValidate ManualsHandbooksProcess sections
    Then validate user click on "Manuals/Handbooks - Process"
    When Validate user when moving the slider to on position
    Then validate moving the slider to on position only deletingorpasting of link allowed in ProcedureManagement "https://www.google.com/"
    Then Validate Hovering over link cell will display entire link
    Then Validate user can save the updated data and link will become a hyperlink to open the file or website
    Then Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X icon
    When validate user click on AddReference button
    Step skipped
    Then validate Newly added row can be saved with name "Automation Name" only and without ID or link
    Step skipped
    Then Validate user click on the save button
    Step skipped
    Then validate user click on complete button
    Step skipped
    When validate Section is completed, a check next to the "Manuals/Handbooks - Process" label will display in left panel
    Step skipped
    com.wipro.qa.stepDefinitions.ProjectInformationStep.embedScreenshot(io.cucumber.java.Scenario)
    Failed ScreenShot Taken
    FailValidate trainingProcess sections
    Then validate user click on "Training - Process"
    When Validate user when moving the slider to on position
    Then validate moving the slider to on position only deletingorpasting of link allowed in ProcedureManagement "https://www.google.com/"
    Then Validate Hovering over link cell will display entire link
    Then Validate user can save the updated data and link will become a hyperlink to open the file or website
    Then Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X icon
    When validate user click on AddReference button
    Step skipped
    Then validate Newly added row can be saved with name "Automation Name" only and without ID or link
    Step skipped
    Then Validate user click on the save button
    Step skipped
    Then validate user click on complete button
    Step skipped
    When validate Section is completed, a check next to the "Training - Process" label will display in left panel
    Step skipped
    com.wipro.qa.stepDefinitions.ProjectInformationStep.embedScreenshot(io.cucumber.java.Scenario)
    Failed ScreenShot Taken
    FailValidate otherProcess sections
    Then validate user click on "Other - Process"
    When Validate user when moving the slider to on position
    Then validate moving the slider to on position only deletingorpasting of link allowed in ProcedureManagement "https://www.google.com/"
    Then Validate Hovering over link cell will display entire link
    Then Validate user can save the updated data and link will become a hyperlink to open the file or website
    Then Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X icon
    When validate user click on AddReference button
    Step skipped
    Then validate Newly added row can be saved with name "Automation Name" only and without ID or link
    Step skipped
    Then Validate user click on the save button
    Step skipped
    Then validate user click on complete button
    Step skipped
    When validate Section is completed, a check next to the "Other - Process" label will display in left panel
    Step skipped
    com.wipro.qa.stepDefinitions.ProjectInformationStep.embedScreenshot(io.cucumber.java.Scenario)
    Failed ScreenShot Taken
    FailValidate checklistsProcess sections
    Then validate user click on "Checklists - Process"
    When validate user click on AddReference button
    Then validate Newly added row can be saved with name "Automation" only and without ID or link
    Then Validate user click on the save button
    USER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLY
    Then validate moving the slider to on position only deletingorpasting of link allowed in ProcedureManagement "https://www.google.com/"
    Then validate user click on complete button
    USER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLY
    When validate Section is completed, a check next to the "Checklists - Process" label will display in left panel
    Then validate Top ReferenceLibrary header is completed with cheked mark
    Then closing the browser
    Step skipped
    com.wipro.qa.stepDefinitions.ProjectInformationStep.embedScreenshot(io.cucumber.java.Scenario)
    Failed ScreenShot Taken
  • Validating AssignTeam Header as a Process Role

    10:51:44 AM / 00:06:32:711 Pass

    Validating AssignTeam Header as a Process Role
    06.03.2021 10:51:44 06.03.2021 10:58:17 00:06:32:711 · #test-id=1,008
    PassValidate ProcessTeamLeads Section: Select Roles and add professional name and Navigation
    When validate "Process Team Leads" section is NOT completed, an empty circle next to the Section label will display in left panel
    When validate toggle is ON and the name field will enable
    When validate entering the assignee name, it will search for matching names and display NameJobFamilyOffice "Matthew Fowler / Lead / Kansas"
    Then Validate user click on the save button
    USER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLY
    When validate upon making an edit, the Save button will be enabled and the Complete button will be disable "Pooja Chaurasiya / Project Engineer / Wipro"
    When validate System will prompt user to save record if user is moving away from sectionscreen to "Process Team" without saving data
    When validate the section information has been saved and the Complete button will be enabled
    When validate toggling off a role with a name populated the name will clear and field will disable
    When validate For select roles, user can select +Add Professional which will create a new blank field to populate an additional professional for a given role "Matthew Fowler / Lead / Kansas","Pooja Chaurasiya / Project Engineer / Wipro"
    Then Validate user click on the save button
    USER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLY
    When validate a section within a header area that does not have dependencies Project Information, Project Reference Library, Assign Project Lead has been marked complete, the Reset, Save and Complete buttons will be replaced with an Edit button
    When validate Section is completed, a check next to the "Process Team Leads" label will display in left panel
    Then Validate user click on the Edit button
    When validate clicking on Define User Permissions displays a list of user permissions so that I can assign an individual in Discipline "Matthew Fowler / Lead / Kansas"
    Then validate hovering over i icon next to user permissions provides additional informationORdescription of permissions
    Then validate user can select Save to save the selections
    PassValidate ProcessTeam Section: Select Roles and add professional name and Navigation
    Then validate user click on "Process Team"
    When validate "Process Team" section is NOT completed, an empty circle next to the Section label will display in left panel
    When validate toggle is ON and the name field will enable
    When validate entering the assignee name, it will search for matching names and display NameJobFamilyOffice "Rohan Mendu / Project Engineer / Wipro"
    Then Validate user click on the save button
    USER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLY
    When validate upon making an edit, the Save button will be enabled and the Complete button will be disable "Himani Bhatnagar / null / undefined"
    When validate System will prompt user to save record if user is moving away from sectionscreen to "Process Team Leads" without saving data
    When validate the section information has been saved and the Complete button will be enabled
    When validate toggling off a role with a name populated the name will clear and field will disable
    When validate For select roles, user can select +Add Professional which will create a new blank field to populate an additional professional for a given role "Rohan Mendu / Project Engineer / Wipro","Himani Bhatnagar / null / undefined"
    Then Validate user click on the save button
    USER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLY
    When validate a section within a header area that does not have dependencies Project Information, Project Reference Library, Assign Project Lead has been marked complete, the Reset, Save and Complete buttons will be replaced with an Edit button
    When validate Section is completed, a check next to the "Process Team" label will display in left panel
    Then Validate user click on the Edit button
    When validate clicking on Define User Permissions displays a list of user permissions so that I can assign an individual in Discipline "Rohan Mendu / Project Engineer / Wipro"
    Then validate hovering over i icon next to user permissions provides additional informationORdescription of permissions
    Then validate user can select Save to save the selections
  • Validating ProjectActivity Header as a Process Role

    10:58:58 AM / 00:00:00:000 Pass

    Validating ProjectActivity Header as a Process Role
    06.03.2021 10:58:58 06.03.2021 10:58:58 00:00:00:000 · #test-id=1,065
  • Gig Workflows as a Process role

    11:01:57 AM / 00:11:59:721 Pass

    Gig Workflows as a Process role
    06.03.2021 11:01:57 06.03.2021 11:13:56 00:11:59:721 · #test-id=1,094
    PassCompleted all the the five steps on Gig Worflow for Process discipline
    Given validate user login as a "process@bv.com" role
    USER HAS LOGGED-IN SUCCESSFULLY
    Then validate user select newly created project card
    PROJECT HAS BEEN SELECTED SUCCESSFULLY
    And user select giga workflow from top menu
    And user select the option gig workflow dropdown "Line Schedule"
    And user select activity information
    Activity
    Activity Information
    And user click edit button to edit existing details.
    And user fill activity information form
    And user select Customize Fragnet
    Activity
    Customize Fragnet
    And user click edit button and change fileds on customize fragnet page
    And user click save continue button
    And user select FragnetStepInformation tab
    Activity
    FragnetStep Information
    And user click edit button and change fileds on FragnetStepInformation
    And user click save continue button
    And User selects Stepfour Customize Gignet
    And user click edit button for edit
    And user remove all selected customie gignet
    Prepare & Issue Process Line Schedule
    And user fill values and completed stepfour Customize Gignet and save continue allprocess
    Prepare & Issue Process Line Schedule
    And user select StepFive Gig Information
    Activity Gignet Giginfo
    And user click edit button for edit
    And user remove all selected Giginformation
    Prepare & Issue Process Line Schedule
    And user selects Selected values in Stepfive and complete slide menu on Gig information
    Prepare & Issue Process Line ScheduleEngineer Prepare,Engineer Review,Engineer Update And Sign,Engineer Review And Sign,Lead Engineer Review Fragnet For Completion And Sign
  • Validating View/Approve Project Plan Header as a Process role

    11:13:56 AM / 00:00:00:000 Pass

    Validating View/Approve Project Plan Header as a Process role
    06.03.2021 11:13:56 06.03.2021 11:13:56 00:00:00:000 · #test-id=1,120
  • Validating Project Information Header as a Piping Role

    11:19:00 AM / 00:05:04:098 Pass

    Validating Project Information Header as a Piping Role
    06.03.2021 11:19:00 06.03.2021 11:24:04 00:05:04:098 · #test-id=1,146
    @projectInformation
    PassValidate Login
    Given validate user login as a "piping@bv.com" role
    USER HAS LOGGED-IN SUCCESSFULLY
    Then validate user select newly created project card
    PROJECT HAS BEEN SELECTED SUCCESSFULLY
    Then validate "Project Information" header is clicked
    USER HAS BEEN CLICKED ON HEADER SUCCESSFULLY
    PassValidate Login
    Given validate user login as a "piping@bv.com" role
    USER HAS LOGGED-IN SUCCESSFULLY
    Then validate user select newly created project card
    PROJECT HAS BEEN SELECTED SUCCESSFULLY
    Then validate "WBS Information" header is clicked
    USER HAS BEEN CLICKED ON HEADER SUCCESSFULLY
    Passchecking the buttons operations
    When validate user updateORenter value in 2D Design Software Textbox "Automation Test" and then reset, save button is enable
    When Validate user click on ResetButton
    Then Validate ResetPage modal is popUp
    Then validate Reset message is display under pop Modal
    Then validate click on cancel button modal is disapear
    Then validate again user click on reset button
    Then validate user click on continue button
    Then validate reset and save button is disable and complete button is enabled
    Then validate user updateORenter value in 2D Design Software Textbox "Automation Test" and then reset, save button is enable
    Then validate user click on save button then reset and save button is disable and complete button is enabled
    When validate addField button is Display and click
    Then validate user click on the save button
    Then validate filed validation eror message is display
  • Validating WBS Information Header Piping Role

    11:23:06 AM / 00:02:28:598 Pass

    Validating WBS Information Header Piping Role
    06.03.2021 11:23:06 06.03.2021 11:25:35 00:02:28:598 · #test-id=1,203
    @WBSInformationDPS
    Passvalidate As a Piping discipline I will see sections: Pipe Specification List
    Then validate viewing data that needs to be updated, I can click on Pipe Specification List to addOrupdate the data and changes have been made on the screen by clicking on save "66666","Automation Piping","Test Class"
    Then Validate user click on the save button
    USER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLY
    Then validate user click on complete button
    USER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLY
    Then validate Section is completed, a check next to the "Pipe Specification List" label will display in left panel
    Passvalidate As a Piping discipline I will see sections: Tie-in Priority List
    Then validate user click on "Tie-in Priority List"
    Then validate viewing data that needs to be updated, I can click on addROW button to addOrupdate the data and changes have been made on the screen the Save button enable "6666","664"
    Then Validate user click on the save button
    USER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLY
    Then validate user click on complete button
    USER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLY
    Then validate Section is completed, a check next to the "Tie-in Priority List" label will display in left panel
    PassValidate SystemFluid List Section
    Then validate user click on "System/Fluid List"
    When validate viewing data that needs to be updated, i can click on addROW button to addOrupdate the data and changes have been made on the screen the Save button enable "AutoFliud"
    Then Validate user click on the save button
    USER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLY
    Then validate user click on complete button
    USER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLY
    When The last section within the last header area with dependencies is being marked Complete, and it IS the LAST section of the LAST of two header areas to be marked complete, a popup will be displayed identifying the process that will be initiated if they continue
    Then validate Section is completed, a check next to the "System/Fluid List" label will display in left panel
    Then validate Top header is completed with cheked mark
    Then closing the browser
  • Validating Reference Library Header as a Piping role

    11:25:35 AM / 00:12:11:006 Fail

    Validating Reference Library Header as a Piping role
    06.03.2021 11:25:35 06.03.2021 11:37:46 00:12:11:006 · #test-id=1,239
    PassValidate ProjectSpecificDocumentsPiping sections
    When Validate user when moving the slider to on position
    Then validate moving the slider to on position only editing of name "Automation" and ID, deletingorpasting of Link "https://www.google.com/" allowed
    Then Validate Hovering over link cell will display entire link
    Then Validate user can save the updated data and link will become a hyperlink to open the file or website
    Then Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X icon
    When validate user click on AddReference button
    Then validate Newly added row can be saved with categoryName and without ID or link "Automation Category"
    Then Validate user click on the save button
    USER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLY
    Then validate user click on complete button
    USER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLY
    When validate Section is completed, a check next to the "Project-Specific Documents - Piping" label will display in left panel
    PassValidate ClientDocumentPiping section
    Then validate user click on "Client Documents - Piping"
    When validate user click on AddReference button
    Then validate Newly added row can be saved with categoryName and without ID or link "Automation Category"
    Then validate moving the slider to on position only editing of name "Automation" and ID, deletingorpasting of Link "https://www.google.com/" allowed
    Then Validate user click on the save button
    USER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLY
    Then validate user click on complete button
    USER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLY
    When validate Section is completed, a check next to the "Client Documents - Piping" label will display in left panel
    FailValidate ProceduresPiping section
    Then validate user click on "Procedures - Piping"
    When Validate user when moving the slider to on position
    Then validate moving the slider to on position only deletingorpasting of link allowed in ProcedureManagement "https://www.google.com/"
    Then Validate Hovering over link cell will display entire link
    Then Validate user can save the updated data and link will become a hyperlink to open the file or website
    Then Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X icon
    When validate user click on AddReference button
    Step skipped
    Then validate Newly added row can be saved with name "Automation Name" only and without ID or link
    Step skipped
    Then Validate user click on the save button
    Step skipped
    Then validate user click on complete button
    Step skipped
    When validate Section is completed, a check next to the "Procedures - Piping" label will display in left panel
    Step skipped
    com.wipro.qa.stepDefinitions.ProjectInformationStep.embedScreenshot(io.cucumber.java.Scenario)
    Failed ScreenShot Taken
    FailValidate calculationTemplatesPiping sections
    Then validate user click on "Calculation Templates - Piping"
    When Validate user when moving the slider to on position
    Then validate moving the slider to on position only deletingorpasting of link allowed in ProcedureManagement "https://www.google.com/"
    Then Validate Hovering over link cell will display entire link
    Then Validate user can save the updated data and link will become a hyperlink to open the file or website
    Then Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X icon
    When validate user click on AddReference button
    Step skipped
    Then validate Newly added row can be saved with name "Automation" only and without ID or link
    Step skipped
    Then Validate user click on the save button
    Step skipped
    Then validate moving the slider to on position only deletingorpasting of link allowed in ProcedureManagement "https://www.google.com/"
    Step skipped
    Then validate user click on complete button
    Step skipped
    When validate Section is completed, a check next to the "Calculation Templates - Piping" label will display in left panel
    Step skipped
    com.wipro.qa.stepDefinitions.ProjectInformationStep.embedScreenshot(io.cucumber.java.Scenario)
    Failed ScreenShot Taken
    FailValidate typicalDetailsPiping sections
    Then validate user click on "Typical Details - Piping"
    When Validate user when moving the slider to on position
    Then validate moving the slider to on position only deletingorpasting of link allowed in ProcedureManagement "https://www.google.com/"
    Then Validate Hovering over link cell will display entire link
    Then Validate user can save the updated data and link will become a hyperlink to open the file or website
    Then Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X icon
    When validate user click on AddReference button
    Step skipped
    Then validate Newly added row can be saved with name "Automation" only and without ID or link
    Step skipped
    Then Validate user click on the save button
    Step skipped
    Then validate moving the slider to on position only deletingorpasting of link allowed in ProcedureManagement "https://www.google.com/"
    Step skipped
    Then validate user click on complete button
    Step skipped
    When validate Section is completed, a check next to the "Typical Details - Piping" label will display in left panel
    Step skipped
    com.wipro.qa.stepDefinitions.ProjectInformationStep.embedScreenshot(io.cucumber.java.Scenario)
    Failed ScreenShot Taken
    FailValidate ManualsHandbooksPiping sections
    Then validate user click on "Manuals/Handbooks - Piping"
    When Validate user when moving the slider to on position
    Then validate moving the slider to on position only deletingorpasting of link allowed in ProcedureManagement "https://www.google.com/"
    Then Validate Hovering over link cell will display entire link
    Then Validate user can save the updated data and link will become a hyperlink to open the file or website
    Then Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X icon
    When validate user click on AddReference button
    Step skipped
    Then validate Newly added row can be saved with name "Automation Name" only and without ID or link
    Step skipped
    Then Validate user click on the save button
    Step skipped
    Then validate user click on complete button
    Step skipped
    When validate Section is completed, a check next to the "Manuals/Handbooks - Piping" label will display in left panel
    Step skipped
    com.wipro.qa.stepDefinitions.ProjectInformationStep.embedScreenshot(io.cucumber.java.Scenario)
    Failed ScreenShot Taken
    PassValidate trainingPiping sections
    Then validate user click on "Training - Piping"
    When validate user click on AddReference button
    Then validate Newly added row can be saved with categoryName and without ID or link "Automation Category"
    Then validate moving the slider to on position only editing of name "Automation" and ID, deletingorpasting of Link "https://www.google.com/" allowed
    Then Validate user click on the save button
    USER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLY
    Then validate user click on complete button
    USER HAS BEEN CLICKED ON COMPLETE BUTTON SUCCESSFULLY
    When validate Section is completed, a check next to the "Training - Piping" label will display in left panel
    FailValidate otherPiping sections
    Then validate user click on "Other - Piping"
    When Validate user when moving the slider to on position
    Then validate moving the slider to on position only deletingorpasting of link allowed in ProcedureManagement "https://www.google.com/"
    Then Validate Hovering over link cell will display entire link
    Then Validate user can save the updated data and link will become a hyperlink to open the file or website
    Then Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X icon
    When validate user click on AddReference button
    Step skipped
    Then validate Newly added row can be saved with name "Automation Name" only and without ID or link
    Step skipped
    Then Validate user click on the save button
    Step skipped
    Then validate user click on complete button
    Step skipped
    When validate Section is completed, a check next to the "Other - Piping" label will display in left panel
    Step skipped
    com.wipro.qa.stepDefinitions.ProjectInformationStep.embedScreenshot(io.cucumber.java.Scenario)
    Failed ScreenShot Taken
    FailValidate checklistsPiping sections
    Then validate user click on "Checklists - Piping"
    When Validate user when moving the slider to on position
    Then validate moving the slider to on position only deletingorpasting of link allowed in ProcedureManagement "https://www.google.com/"
    Then Validate Hovering over link cell will display entire link
    Then Validate user can save the updated data and link will become a hyperlink to open the file or website
    Then Validate clicking in the link cell for a given row that already has a link populated the PLI can choose to delete the link by selecting X icon
    When validate user click on AddReference button
    Step skipped
    Then validate Newly added row can be saved with name "Automation" only and without ID or link
    Step skipped
    Then Validate user click on the save button
    Step skipped
    Then validate user click on complete button
    Step skipped
    When validate Section is completed, a check next to the "Checklists - Piping" label will display in left panel
    Step skipped
    Then validate Top ReferenceLibrary header is completed with cheked mark
    Step skipped
    Then closing the browser
    Step skipped
    com.wipro.qa.stepDefinitions.ProjectInformationStep.embedScreenshot(io.cucumber.java.Scenario)
    Failed ScreenShot Taken
  • Validating AssignTeam Header as a PipingRole

    11:37:46 AM / 00:06:32:777 Pass

    Validating AssignTeam Header as a PipingRole
    06.03.2021 11:37:46 06.03.2021 11:44:19 00:06:32:777 · #test-id=1,376
    PassValidate PipingTeamLeads Section: Select Roles and add professional name and Navigation
    When validate "Piping Team Leads" section is NOT completed, an empty circle next to the Section label will display in left panel
    When validate toggle is ON and the name field will enable
    When validate entering the assignee name, it will search for matching names and display NameJobFamilyOffice "shilpa vepur / Project Engineer / Wipro"
    Then Validate user click on the save button
    USER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLY
    When validate upon making an edit, the Save button will be enabled and the Complete button will be disable "nuthalapati sravanthi / Project Engineer / Wipro"
    When validate System will prompt user to save record if user is moving away from sectionscreen to "Piping Team" without saving data
    When validate the section information has been saved and the Complete button will be enabled
    When validate toggling off a role with a name populated the name will clear and field will disable
    When validate For select roles, user can select +Add Professional which will create a new blank field to populate an additional professional for a given role "shilpa vepur / Project Engineer / Wipro","nuthalapati sravanthi / Project Engineer / Wipro"
    Then Validate user click on the save button
    USER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLY
    When validate a section within a header area that does not have dependencies Project Information, Project Reference Library, Assign Project Lead has been marked complete, the Reset, Save and Complete buttons will be replaced with an Edit button
    When validate Section is completed, a check next to the "Piping Team Leads" label will display in left panel
    Then Validate user click on the Edit button
    When validate clicking on Define User Permissions displays a list of user permissions so that I can assign an individual in Discipline "shilpa vepur / Project Engineer / Wipro"
    Then validate hovering over i icon next to user permissions provides additional informationORdescription of permissions
    Then validate user can select Save to save the selections
    PassValidate PipingTeam Section: Select Roles and add professional name and Navigation
    Then validate user click on "Piping Team"
    When validate "Piping Team" section is NOT completed, an empty circle next to the Section label will display in left panel
    When validate toggle is ON and the name field will enable
    When validate entering the assignee name, it will search for matching names and display NameJobFamilyOffice "Kaushikee Bhawsar / null / undefined"
    Then Validate user click on the save button
    USER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLY
    When validate upon making an edit, the Save button will be enabled and the Complete button will be disable "Nuthalapati Sravanthi / null / undefined"
    When validate System will prompt user to save record if user is moving away from sectionscreen to "Piping Team Leads" without saving data
    When validate the section information has been saved and the Complete button will be enabled
    When validate toggling off a role with a name populated the name will clear and field will disable
    When validate For select roles, user can select +Add Professional which will create a new blank field to populate an additional professional for a given role "Kaushikee Bhawsar / null / undefined","Nuthalapati Sravanthi / null / undefined"
    Then Validate user click on the save button
    USER HAS BEEN CLICKED ON SAVE BUTTON SUCCESSFULLY
    When validate a section within a header area that does not have dependencies Project Information, Project Reference Library, Assign Project Lead has been marked complete, the Reset, Save and Complete buttons will be replaced with an Edit button
    When validate Section is completed, a check next to the "Piping Team" label will display in left panel
    Then Validate user click on the Edit button
    When validate clicking on Define User Permissions displays a list of user permissions so that I can assign an individual in Discipline "Kaushikee Bhawsar / null / undefined"
    Then validate hovering over i icon next to user permissions provides additional informationORdescription of permissions
    Then validate user can select Save to save the selections
  • Validating Project Activity Header as a Piping Role

    11:45:00 AM / 00:00:00:000 Pass

    Validating Project Activity Header as a Piping Role
    06.03.2021 11:45:00 06.03.2021 11:45:00 00:00:00:000 · #test-id=1,433
  • Gig Workflows as a Piping role

    11:48:21 AM / 00:04:13:366 Fail

    Gig Workflows as a Piping role
    06.03.2021 11:48:21 06.03.2021 11:52:35 00:04:13:366 · #test-id=1,462
    FailCompleted all the the five steps on Gig Worflow for Piping discipline
    Given validate user login as a "piping@bv.com" role
    USER HAS LOGGED-IN SUCCESSFULLY
    Then validate user select newly created project card
    PROJECT HAS BEEN SELECTED SUCCESSFULLY
    And user select giga workflow from top menu
    And user select the option gig workflow dropdown "Tie-In List And Details"
    And user select activity information
    Activity
    Activity Information
    And user click edit button to edit existing details.
    And user fill activity information form
    And user select Customize Fragnet
    Activity
    Customize Fragnet
    And user click edit button and change fileds on customize fragnet page
    And user click save continue button
    And user select FragnetStepInformation tab
    Activity
    FragnetStep Information
    And user click edit button and change fileds on FragnetStepInformation
    And user click save continue button
    And User selects Stepfour Customize Gignet
    And user click edit button for edit
    And user remove all selected customie gignet
    Update Piping Tie-In List / Prepare Location Drawings & Details
    IHR Piping Tie-In List, Location Dwgs & Details
    Incorp IHR Comments And Issue Piping Tie-In List, Location Drawings, & Details For Client Review
    Client Review Piping Tie-In List, Location Drawings & Details
    Incorp Client Comments And Issue Piping Tie-In List, Location Drawings, & Details For 3rd Party Review
    And user fill values and completed stepfour Customize Gignet and save continue allprocess
    Update Piping Tie-In List / Prepare Location Drawings & Details
    IHR Piping Tie-In List, Location Dwgs & Details
    Incorp IHR Comments And Issue Piping Tie-In List, Location Drawings, & Details For Client Review
    Client Review Piping Tie-In List, Location Drawings & Details
    Incorp Client Comments And Issue Piping Tie-In List, Location Drawings, & Details For 3rd Party Review
    Step skipped
    And user select StepFive Gig Information
    Activity Gignet Giginfo
    Step skipped
    And user click edit button for edit
    Step skipped
    And user remove all selected Giginformation
    Update Piping Tie-In List / Prepare Location Drawings & Details
    IHR Piping Tie-In List, Location Dwgs & Details
    Incorp IHR Comments And Issue Piping Tie-In List, Location Drawings, & Details For Client Review
    Client Review Piping Tie-In List, Location Drawings & Details
    Incorp Client Comments And Issue Piping Tie-In List, Location Drawings, & Details For 3rd Party Review
    Step skipped
    And user selects Selected values in Stepfive and complete slide menu on Gig information
    Update Piping Tie-In List / Prepare Location Drawings & DetailsReview Tie-Ins On P&IDs,Gather Info On Physical Tie-In Locations,Locate Tie-Ins In Model,Create Tie-In Spreadsheet,Create Tie-In Package,Create Tie-In Location Drawing,Issue Drawing For IHR
    IHR Piping Tie-In List, Location Dwgs & DetailsIHR Facilitator Compiles IHR Comments
    Incorp IHR Comments And Issue Piping Tie-In List, Location Drawings, & Details For Client ReviewAddress IHR Comments,Issue For Client Review
    Client Review Piping Tie-In List, Location Drawings & DetailsClient Review Facilitator Compiles Comments
    Incorp Client Comments And Issue Piping Tie-In List, Location Drawings, & Details For 3rd Party ReviewAddress Client Review Comments,Extract Info From Model / Clean Up And Annotate,Issue For 3rd Party Review
    3rd Party Review Piping Tie-In List, Location Drawings, & Details3rd Party Review Facilitator Compiles Comments
    Incorp 3rd Party Comments And IFC Piping Tie-In List, Location Drawings, & DetailsAddress 3rd Party Review Comments,Extract Info From Model / Clean Up And Annotate,PDE Review Approve And Stamp,PLD Review And Issue
    Step skipped
    com.wipro.qa.stepDefinitions.ProjectInformationStep.embedScreenshot(io.cucumber.java.Scenario)
    Failed ScreenShot Taken
  • Validating ViewApprove Full Project Plan Header as a Piping Role

    11:52:35 AM / 00:00:00:000 Pass

    Validating ViewApprove Full Project Plan Header as a Piping Role
    06.03.2021 11:52:35 06.03.2021 11:52:35 00:00:00:000 · #test-id=1,488